Ir al contenido
Georgia Commons
Menú

Berrien County · Código de ordenanzas

Part - CODE OF ORDINANCES / Chapter 54 - SUBDIVISIONS / Article III - MINIMUM DESIGN STANDARDS / Division 1 - GENERALLY

Sec. 54-82. Easements.

Sobre este texto

  • As published by Municode, current through 2010-11-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Utility easements. Utility easements for overhead services shall be located within the platted street right-of-way and shall be a minimum width of 20 feet. Where possible, as determined by the county engineer, water lines shall be located on the west and south sides of streets and sewer and gas lines shall be on the east and north sides. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase, they shall be platted within the subdivision or phase thereof. All public utilities within the subdivision shall be located on public rights-of-way.

(b) Drainage easements. Drainage easements shall be provided as required by the county engineer after review of the preliminary improvement plans and preliminary plat of the subject subdivision.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 9-24-2001, § 5-2)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:berrien-county/code/54-82@2010-11-09-83a4956642

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Berrien County Code of Ordinances, Sec. 54-82. Easements | Georgia Commons