Sec. 40-142. Inspections during construction.

About this text

  • As published by Municode, current through 2025-04-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Periodic inspections of the stormwater management practices shown on the approved stormwater management design plan shall be conducted by staff or representatives of the county engineer during construction. Construction inspections shall utilize the approved stormwater management design plan for establishing compliance with the provisions of this article.

If any violations are found, the applicant shall be notified in writing about the nature of the violation and the remedial measures that are required to bring the action or inaction into compliance with the approved stormwater management design plan. In the event that the remedial measures described in such notice have not been completed by the date set forth in the notice, any one or more of the enforcement actions outlined in this article may be taken against the applicant.

History

The history line the source prints at the end of the section.

(Ord. of 9-14-2010, § 4.2)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:brantley-county/code/40-142@2025-04-03-4973256181

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Brantley County Code of Ordinances, Sec. 40-142. Inspections during construction | Georgia Commons