Ir al contenido
Georgia Commons
Menú

Brantley County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 40 - ENVIRONMENT / Article III - STORMWATER MANAGEMENT / Division 3 - CONSTRUCTION INSPECTION OF STORMWATER MANAGEMENT SYSTEMS

Sec. 40-142. Inspections during construction.

Sobre este texto

  • As published by Municode, current through 2025-04-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Periodic inspections of the stormwater management practices shown on the approved stormwater management design plan shall be conducted by staff or representatives of the county engineer during construction. Construction inspections shall utilize the approved stormwater management design plan for establishing compliance with the provisions of this article.

If any violations are found, the applicant shall be notified in writing about the nature of the violation and the remedial measures that are required to bring the action or inaction into compliance with the approved stormwater management design plan. In the event that the remedial measures described in such notice have not been completed by the date set forth in the notice, any one or more of the enforcement actions outlined in this article may be taken against the applicant.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 9-14-2010, § 4.2)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:brantley-county/code/40-142@2025-04-03-4973256181

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.