Part II - CODE OF ORDINANCES / Chapter 40 - ENVIRONMENT / Article III - STORMWATER MANAGEMENT / Division 3 - CONSTRUCTION INSPECTION OF STORMWATER MANAGEMENT SYSTEMS
Sec. 40-141. Notice of construction commencement.
Sobre este texto
- As published by Municode, current through 2025-04-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The applicant must notify Brantley County at least 24 hours prior to the commencement of construction on a development site. In addition, the applicant must notify the county engineer in advance of the installation of critical components of the stormwater management system shown on the approved stormwater management design plan. The county engineer may, at his discretion, issue verbal or written authorization to proceed with the installation of critical components of the stormwater management system, such as permanent green infrastructure and stormwater management practices, based on the stabilization of contributing drainage areas and other factors.
Historia
(Ord. of 9-14-2010, § 4.1)