Brantley County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 40 - ENVIRONMENT / Article III - STORMWATER MANAGEMENT / Division 3 - CONSTRUCTION INSPECTION OF STORMWATER MANAGEMENT SYSTEMS
Sec. 40-143. Final inspection and record drawings.
Sobre este texto
- As published by Municode, current through 2025-04-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Subsequent to the final installation and stabilization of all infrastructure and stormwater management practices shown on the approved stormwater management design plan, and before the issuance of a certificate of occupancy or final plat, the applicant is responsible for assuring that the project has been completed in accordance with the approved stormwater management design plan and submitting record drawings for all green infrastructure and stormwater management practices shown on the approved stormwater management design plan. The record drawings must show the final design specifications for all green infrastructure and stormwater management practices and must be certified by a licensed design professional such as a landscape architect (green infrastructure only) or professional engineer.
A final inspection shall be conducted by the county engineer or his designee to confirm the accuracy of the record drawings.
Historia
(Ord. of 9-14-2010, § 4.3)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.