Brantley County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 40 - ENVIRONMENT / Article III - STORMWATER MANAGEMENT / Division 3 - CONSTRUCTION INSPECTION OF STORMWATER MANAGEMENT SYSTEMS
Sec. 40-143. Final inspection and record drawings.
About this text
- As published by Municode, current through 2025-04-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Subsequent to the final installation and stabilization of all infrastructure and stormwater management practices shown on the approved stormwater management design plan, and before the issuance of a certificate of occupancy or final plat, the applicant is responsible for assuring that the project has been completed in accordance with the approved stormwater management design plan and submitting record drawings for all green infrastructure and stormwater management practices shown on the approved stormwater management design plan. The record drawings must show the final design specifications for all green infrastructure and stormwater management practices and must be certified by a licensed design professional such as a landscape architect (green infrastructure only) or professional engineer.
A final inspection shall be conducted by the county engineer or his designee to confirm the accuracy of the record drawings.
History
(Ord. of 9-14-2010, § 4.3)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.