Skip to content
Georgia Commons
Menu

Paulding County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 66 - SEWERS / Article III - SEWER USE / Division 4 - RESTRICTED USE OF PUBLIC SEWER

Sec. 66-164. Responsibility of discharger.

About this text

  • As published by Municode, current through 2025-12-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

It shall be the responsibility of the person discharging industrial waste into the county sewerage system to:

(1) Build a control structure in the discharge line from his premises, immediately prior to the entrance of the discharge line into the county sewerage system, suitable for the

sampling and measuring of wastes. Plans for this structure must be approved by the board of commissioners. This requirement may be waived if deemed unnecessary by the commission. If no special manhole is required, the control manhole shall be considered to be the nearest downstream manhole in the public sewer to the point at which the building sewer is connected.

(2) Contact the director prior to operation changes which will materially alter characteristics of the waste from the last prior sampling.

(3) Make timely, periodic payments to the county for surcharges for excessive loadings as called for by the most current rate schedule.

History

The history line the source prints at the end of the section.

(Code 1987, § 18-7(n))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:paulding-county/code/66-164@2025-12-09-9bf3a7366f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Paulding County Code of Ordinances, Sec. 66-164. Responsibility of discharger | Georgia Commons