Ir al contenido
Georgia Commons
Menú

Paulding County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 66 - SEWERS / Article III - SEWER USE / Division 4 - RESTRICTED USE OF PUBLIC SEWER

Sec. 66-164. Responsibility of discharger.

Sobre este texto

  • As published by Municode, current through 2025-12-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

It shall be the responsibility of the person discharging industrial waste into the county sewerage system to:

(1) Build a control structure in the discharge line from his premises, immediately prior to the entrance of the discharge line into the county sewerage system, suitable for the

sampling and measuring of wastes. Plans for this structure must be approved by the board of commissioners. This requirement may be waived if deemed unnecessary by the commission. If no special manhole is required, the control manhole shall be considered to be the nearest downstream manhole in the public sewer to the point at which the building sewer is connected.

(2) Contact the director prior to operation changes which will materially alter characteristics of the waste from the last prior sampling.

(3) Make timely, periodic payments to the county for surcharges for excessive loadings as called for by the most current rate schedule.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Code 1987, § 18-7(n))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:paulding-county/code/66-164@2025-12-09-9bf3a7366f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.