Sec. 58-33. Termination of access site.

About this text

  • As published by Municode, current through 2021-06-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) At the conclusion of the harvesting operation, the foreman or supervisor in charge thereof shall notify the public works director, or his designee, that the harvesting operation is complete and request an inspection of the access site to determine if there has been any damage to the road or right-of-way as a result of the harvesting operation. Damages caused by the harvesting operation shall be repaired by the harvesting person within 15 days or, if necessary, by the county or a contractor of the county's choice, at the expense of the person responsible therefor.

(b) Culverts installed and utilized in the harvesting operation may be removed, provided that the road right-of-way shall be restored to the same condition existing prior to the installation of the culvert.

History

The history line the source prints at the end of the section.

(Ord. No. 92-02, § III, 11-12-1991)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:screven-county/code/58-33@2021-06-08-0bf5a8c9dd

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.