Screven County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 58 - ROADS AND BRIDGES / Article II - TIMBER HARVESTING
Sec. 58-33. Termination of access site.
Sobre este texto
- As published by Municode, current through 2021-06-08
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) At the conclusion of the harvesting operation, the foreman or supervisor in charge thereof shall notify the public works director, or his designee, that the harvesting operation is complete and request an inspection of the access site to determine if there has been any damage to the road or right-of-way as a result of the harvesting operation. Damages caused by the harvesting operation shall be repaired by the harvesting person within 15 days or, if necessary, by the county or a contractor of the county's choice, at the expense of the person responsible therefor.
(b) Culverts installed and utilized in the harvesting operation may be removed, provided that the road right-of-way shall be restored to the same condition existing prior to the installation of the culvert.
Historia
(Ord. No. 92-02, § III, 11-12-1991)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.