Dawson · Código de ordenanzas
Chapter 12 - MUNICIPAL UTILITIES AND SERVICES / Article II - SEWER USE / Division 3 - INDUSTRIAL COST RECOVERY CHARGE FOR CONTRIBUTION OF WASTES OTHER THAN DOMESTIC
Sec. 12-47. Computing ICR charge; installment payment.
Sobre este texto
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All industrial users connected to the municipal sewer system who discharge other than domestic wastes shall pay an annual industrial cost re-covery charge in accordance with the following formula:
F × $128.48 / 1000 GPD + C × $29.98 / #/Day + SS × $17.10 / #/Day 1/L
Where:
| | | | |----|----|----| | F | = | Industry Peak Flow Contribution (GPD) | | C | = | Pounds of CBOD 5 per day contribution | | SS | = | Pounds of suspended solids per day contribution | | L | = | Remaining useful life of the project which is thirty (30) years beginning in 1976. |
The city may elect to receive the ICR payment either in monthly installments or annually.
Historia
(Code 1974, § 21-108(3), (4))
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.