Ir al contenido
Georgia Commons
Menú

Macon-Bibb County · Código de ordenanzas

Part III - CODE OF ORDINANCES / Chapter 29 - UTILITIES AND FRANCHISES / Article VII - DRAINAGE AND PAVING DISTRICTS

Sec. 29-147. Adjustment of utilities.

Sobre este texto

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Whenever the Macon-Bibb County engineer shall notify the owners of properties abutting on any district coming under this article or of any area where a drainage and paving project will occur, to move all water meters and lower all water and gas connections, or sewer connections, necessary to the proper construction of such drainage and paving project, each property owner shall immediately have all connections adjusted according to the plans and to the satisfaction of the engineer, and should the property owner within ten days after receiving such notice, fail to have such connections properly adjusted, or notify the engineer in writing that he does not intend to have such adjustments made, the Macon-Bibb County engineer will have adjustments made, and the cost of same, plus a $15.00 charge for handling shall be added to the assessments against the properties or owners and collected in the same manner as the original assessment, and whenever the engineer shall notify the public utility companies having utilities within the districts or adjacent to any planned drainage and paving project to move, lower or adjust such utilities as may be necessary to the proper construction of such drainage and paving project, the utility companies shall immediately have all utilities adjusted according to the plans and to the satisfaction of the Macon-Bibb County engineer.

Such notice may be served either by leaving same at the residence of the respective property owners or at the office of the respective utilities or by depositing the same in the U.S. mail enclosed in an envelope properly stamped and addressed to the owner. Such notice shall also advise that any person affected may within five days of the date of such notice, appeal to the Macon-Bibb County commission for an extension of time for completing such work directed in such notice.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:macon-bibb/code/29-147@2026-11-14-bb265a9dc9

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.