Alto · Ordenanza de zonificación
Appendix A / Article XXIV - ADMINISTRATION, INTERPRETATION, ENFORCEMENT, PENALTIES AND REMEDIES
Section 2404. Building permit required.
Sobre este texto
- As published by Municode, current through 2025-08-25
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
No building, structure or sign, except as specifically exempted by these regulations, shall be erected, moved, extended, enlarged or structurally altered, nor shall any excavation or filling of any lot for the construction of any building be commenced until the Zoning Administrator or other properly designated agent, or both, has issued a verification of zoning compliance and a building permit for such work in conformity with the provisions of these regulations.
All building permits shall be issued by the Zoning Administrator or other properly designated agent, or both. In cases of uncertainty regarding whether a proposed building or structure conforms to any provisions within these regulations, the Zoning Administrator, or other properly designated agent, or both, shall make the determination. Building permits shall become invalid unless the work authorized by it shall have been commenced within ninety (90) days of its date of issue, or if the work authorized by it is suspended or abandoned for a period of six (6) months or more.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.