Ir al contenido
Georgia Commons
Menú

Avondale Estates · Ordenanza de zonificación

Appendix A / Chapter 21 - ZONING ORDINANCE / Article 6 - SITE DEVELOPMENT FEATURES / Division 6.1 - GENERAL LOT AND BUILDING REGULATIONS

Sec. 21-6.1.5. Underground electric and communication utilities.

Sobre este texto

  • As published by Municode, current through 2024-04-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Undergrounding utilities. Utilities, including telephone, electric power, and cable television in both public and private rights-of-way shall be placed underground for all new developments with total floor areas fifty thousand (50,000) square feet or over. This requirement does not apply to high voltage power lines.

B. Fee in lieu. Except when extreme conditions of underlying rock, the expense to bury overhead utilities is deemed to be unreasonably costly due to the complexity of the work, or other conditions prevent this requirement from being met, the developer may request approval from the city manager for a fee in lieu arrangement meeting the following:

1. A city fund, known as the "The City of Avondale Estates Utility Conversion Fund" is hereby created. The purpose of said fund is to accept deposits as described herein, along with other funds or grants apportioned by the board of mayor and commissioners, and the use of such funds shall be restricted for the sole purpose of offsetting the cost of projects undertaken by the city that bury or relocate power lines from streets and sidewalks.

2. Developer shall contribute toward the city's utility conversion fund in lieu of requiring burial of the utilities. Such fee in lieu arrangement shall be based on a cost per linear foot of such underground relocation of utilities established by the board of mayor and commissioners, and it may be adjusted from time to time by city ordinance.

C. Sequencing. Fee in lieu or burial of utilities shall be done prior to issuance of any certificate of occupancy being issued for structures in any phase abutting the right-of-way within which the overhead utilities are situated.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:avondale-estates/zoning/21-6.1.5@2024-04-17-50d55a3dbd

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Avondale Estates Zoning Ordinance, Sec. 21-6.1.5. Underground electric and communication utilities | Georgia Commons