Barrow County · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 89 - UNIFIED DEVELOPMENT CODE / Article X - PROJECT DESIGN STANDARDS
Sec. 89-1187. Deceleration lanes and turn lanes.
Sobre este texto
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Median breaks. If the street has an existing or proposed median, and the developer desires to construct a median break to serve the development, a left turn lane leading to the median break shall be provided by the developer meeting the design standards of Barrow County.
(b) Deceleration and turn lane construction standards.
(1) Deceleration lanes and turn lanes shall be a minimum length of 150 feet, with an additional 50-foot taper length, and a pavement width of 12 feet (exclusive of curb and gutter). Additional right-of-way to accommodate the deceleration lane or turn lane and a ten-foot shoulder shall be dedicated by the developer to Barrow County.
Deceleration lanes and tapers may be required to be of greater length, based on the design speed of the road.
(2) Curb and gutter along all deceleration lanes and tapers are required, and shall be constructed in accordance with subsection 89-1183(e)(3). The curb and gutter may end at the termination of the full-width section of the deceleration lane unless the existing roadway beyond the deceleration lane has curb and gutter.
(3) Associated drainage improvements as deemed necessary by the construction of the deceleration or turn lane shall also be required.
(4) Other project access improvements may be required by the director of public works in addition to or in lieu of a required deceleration lane in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public, based on a traffic study prepared by a professional engineer for the developer.
(5) The developer will pay the cost of any catch basins that must be constructed along an existing county road as a result of the deceleration lane.
(6) All utilities and drainpipes shall be relocated at the developer's expense outside of the deceleration lane.
(7) In cases involving rock cuts, deep fills or cuts, proximity to floodplain, etc., the requirements of pavement widening for full deceleration lanes may be modified or waived by the director of public works following accepted engineering practice.
Historia
(Ord. of 10-13-2020)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.