Ir al contenido
Georgia Commons
Menú

Barrow County · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 89 - UNIFIED DEVELOPMENT CODE / Article XII - PROCEDURES AND PERMITS

Sec. 89-1320. Flood area permit.

Sobre este texto

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Flood area permit required. If development or construction is proposed within or affecting an area of special flood hazard, approval of a flood area permit application shall be required. An application for a flood area permit may be included with and reviewed along with a development permit application.

(b) Application process for a flood area permit.

(1) Application for a flood area permit shall be made to the planning and community development department on forms furnished by them prior to any development activities.

(2) The application for a flood area permit is to include the following:

a. Plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question.

b. Location of existing or proposed structures, fill, storage of materials and drainage facilities.

c. Elevation in relation to mean sea level of the proposed lowest floor, including basement, of all buildings.

d. Elevation in relation to mean sea level to which any nonresidential building will be floodproofed.

e. Design certificate from a registered professional engineer or architect that any nonresidential floodproofed building will meet the floodproofing criteria in the flood damage prevention section of the land development activities article of this Development Code.

f. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development.

g. Construction stage:

1. For all new construction and substantial improvements the permit holder shall provide to the planning and community development director an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.

2. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. The planning and community development director shall review the above referenced certification data submitted.

Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections requires hereby, shall be cause to issue a stop-work order for the project.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 10-13-2020)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:barrow-county/zoning/89-1320@2026-11-23-b2c7bbee9f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Barrow County Zoning Ordinance, Sec. 89-1320. Flood area permit | Georgia Commons