Sec. 89-1325. Building permitting.
Sobre este texto
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Building permit required. A building permit issued by the building official is required in advance of the initiation of construction, erection, moving or alteration of any building or structure in accordance the provisions of the Building Code. No building permit shall be issued and no building shall be erected on any lot in the county unless access has been established in accordance with this Development Code. No building permits shall be issued before approval of the final plat. All structures shall comply with the requirements of this Development Code, whether or not a building permit is required.
(b) Procedures to obtain a building permit.
(1) Procedure for approval. The building official is responsible for administering and enforcing the building codes of the county.
a. Prior to issuance of a building permit the owner shall have received a development permit if required by this Development Code.
b. Zoning verification shall be obtained from the planning and community development department. The following shall be attached to or included within the zoning verification application:
1. A street address number as shown on the final plat or as assigned by the county; the tax map and parcel number, verified by tax office; and a plat, location sketch map or other graphic indication of the location of the lot.
2. For a single-family detached or two-family dwelling, a building site plan drawn to scale shall be submitted with the application, showing the following:
i. Identity, address and phone number of the owner of the lot, the applicant for the building permit, and the person responsible for all construction and land-disturbing activities on the property;
ii. Lot dimensions with property line monuments located thereon, minimum principal building setback lines, the lot width measured at the minimum front setback line, and the lot frontage measured along the street right-of-way line;
iii. Shape, size, height and location of the structure(s) proposed to be erected, demolished, altered, or moved, and of any buildings already on the lot;
iv. The use of structures, including the number of dwelling units and minimum floor area within each structure;
v. Easements (public and private) including natural resource or conservation easements established under the requirements of the environmental protection article of this Development Code;
vi. Watercourses, stream buffers and the limits of the 100-year floodplain;
vii. Erosion control and tree protection measures proposed to be placed and maintained on the property;
viii. Street names and street right-of-way lines; and ix. Other information regarding abutting property as directly affects the application;
3. For a multi-family or nonresidential building, the site plan upon which was granted project approval by the Planning and Community Development Department under subsection 89-1315(9).
(2) Application for a building permit shall be made to the building official. The application shall include:
a. Application on the form furnished by the building official, requesting issuance of a building permit.
b. A copy of the zoning verification approved by the planning and community development department.
c. Architectural plans for principal multi-family or nonresidential buildings, prepared in conformance with this Development Code and the applicable building codes. Plans shall be prepared by or under the supervision of an architect registered in Georgia, who shall sign and seal each sheet in the original set of drawings.
d. County health department approval if an on-site sewage disposal system has been allowed.
e. Payment of the building permit application and review fee.
f. Water meter receipt issued by the applicable public water jurisdiction, if applicable.
g. For applications to move a house, structure or building, the following additional information is required:
1. The name of the person performing the moving;
2. The origin and destination of the moving;
3. The names of the owners of the property from which the house is removed and of the property to which it is moved;
4. A detailed outline of the route to be followed and the equipment to be used;
and
5. An estimate of the time involved, including the time of the day when said operation shall be conducted.
6. Any application for a permit must be made at least 48 hours prior to the proposed moving.
7. In addition to a fee charged for permits, the mover of any house, building or structure shall deposit with the building official $400.00 for each house, to be returned to the mover within five days after such moving if no damage is done to public property.
8. The county sheriff's department shall furnish a police escort if he deems it necessary
(3) Issuance of building permit.
a. The application will be checked by the building official for completeness within five days of receipt. Incomplete applications will be returned to the applicant.
b. Within two weeks following receipt of a complete application, the building official shall indicate on the architectural plans approval or disapproval and attest to same by his signature. One copy shall be returned to the applicant and the original copy shall be retained by the building official.
c. The owner shall be responsible for compliance with this Development Code and all building code requirements, regulations, and for the satisfaction of all of the comments of the building official. Notwithstanding the county's role in accepting and approving submissions specified in this ordinance, the owner is not entitled to rely on approval from the county of any documents as evidence that the development and building plans are all internally consistent or compliant with applicable health and safety codes. Nothing herein is intended to create an actionable duty on the part of county staff.
d. At such time as the owner has addressed the comments to the satisfaction of the building official and the state fire marshal, a building permit will be issued for the structure.
e. Plumbing, electrical and mechanical permits shall be issued separately by the building official or separately identified on the building permit. Such permits must be issued prior to commencement of work by each affected trade.
f. If the work authorized by a building permit has not begun within six months from the date of issuance the permit shall expire, unless it is renewed under the provisions of the building code.
(4) Standards for approval.
(5) Building permits shall be issued only on buildable lots of record, as defined in this Development Code.
(6) Building permits shall be issued in conformance with the adopted technical codes and supplements that constitute the county's building code. Conformance to this Development Code is also required as a prerequisite to issuance of a building permit.
(c) Certificate of occupancy.
(1) It is unlawful to use or occupy or permit the use or occupancy of any part of a building, structure, or premises, until a certificate of occupancy has been issued stating that the building or structure or premises conforms to the requirements of the building codes and this Development Code.
(2) A certificate of occupancy shall be required for any of the following:
a. Occupancy and use of a building or structure constructed or enlarged.
b. Change in use of existing buildings to uses of a different classification.
c. Any change in use of a nonconforming use, lot or building.
(3) Upon completion of construction but prior to occupancy or use for the purpose constructed and prior to utility hookup, the property owner or his agent shall notify the building official and request final inspection of the premises.
(4) The building official shall conduct such inspection as quickly as is reasonably practicable after said request and shall issue a certificate of occupancy only if he finds said construction comports with all applicable local, state or national rules, regulations, statutes, laws, ordinances, and the terms of this resolution.
(5) Permanent electric power may not be supplied to any structure until a certificate of occupancy shall have been issued and the power company contacted by the building official.
(6) A record of all certificates of occupancy shall be maintained by the building official and a copy shall be furnished upon request to any person.
Historia
(Ord. of 10-13-2020)