Sec. 89-177. Mining or quarry operations.
Sobre este texto
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Special use approval required. Quarries and open pit mines, and soil or sand removal or extraction operations, require special use approval by the board of commissioners.
(b) Application requirements. All applications for a mining or quarrying operation shall include the following:
(1) A site plan containing the following information must be a part of such application:
a. Equipment, roads, buildings proposed or existing.
b. Points of ingress and egress.
c. All roads adjacent to the property.
d. All existing or proposed buffers.
e. Existing lakes, ponds, streams, rivers, or other waterways, wetlands and flood hazard areas.
f. Parking areas
g. North arrow, scale of drawing and area to be excavated.
h. Proposed handling and storage areas or overburden, by products and excavated material.
(2) A copy of all documents submitted or prepared for submission to the Georgia Department of Natural Resources for the purposes of obtaining a state mining permit.
(3) A statement as to the intended use of explosives or other hazardous materials and the methods and procedures proposed for the handling, use, storage and disposal of such materials.
(c) Restrictions.
(1) No operation shall be allowed between the hours of 7:00 p.m. and 5:00 a.m. No operation shall be permitted on Sundays, New Years Day, Independence Day, Thanksgiving or Christmas Day. These restrictions shall not apply to routine maintenance and may be varied for special projects, including department of transportation projects and large commercial projects, with the approval of the board of commissioners.
(2) Access is required from paved streets other than residential subdivision streets. Said streets shall be able to withstand maximum load limits established by the State of Georgia.
(3) All gravel and pit access roads shall be maintained with a dustless, non-oiled surface.
(4) Gates must be provided at all points of vehicular and pedestrian ingress and egress and shall be locked when not in regular use.
(5) For quarries and open pit mines, the maximum depth of excavation shall not be below existing groundwater, except in cases where the reclamation plan indicates that a lake or lakes will be a part of the final use of the land or where such plan indicates that adequate fill from overburden is to be used to refill such excavation.
No excavation shall be allowed to lower the water table of the surrounding inhabited properties to the extent there are wells with potable water within 1,000 feet of the excavation area.
(6) Notices shall be posted at regular intervals along the outer limits of the property, which shall warn against trespassing and shall contain a statement pertaining to the use of explosives, if applicable.
(7) The area being excavated for stone mining and quarrying shall be enclosed within a barrier fence of at least four feet high located at least ten feet back from the edge of any excavation. For other mining operations covered by this section, the excavation area shall be surrounded by a four-foot high fence or earthen berms of at least four feet in height covered with thorny shrubs.
(8) All work areas shall be sufficiently illuminated, naturally or artificially, in accordance with the form of the operation and state hours of operation. No direct artificial illumination resulting from the operation shall fall on any land not covered by the application.
(9) Sound levels at the boundaries of the property shall not exceed the following limits when adjacent to residential, commercial or industrial zoning districts existing at the time of establishment of the quarry or mining operation:
a. Long duration sound. For any sound lasting continuously for one second or more, maximum limits are: 60 dBA for projects adjacent to a residential district;
65 dBA for projects adjacent to a commercial district; and 75 dBA for projects adjacent to an industrial district other than heavy industrial.
b. Short duration sound. For any sound having a duration of less than one second, including impulsive sound (i.e., sound having an abrupt onset and rapid decay), the limit shall be 80 dBA at the property line when adjacent to a residential, commercial or industrial zoning district.
c. Method of sound measurement. These sound levels are to be measured in decibels in accordance with the standards promulgated by the American National Standards Institute (ANSI), and shall be made with a sound level meter using the (a-) weighting scale.
(10) The blasting limit of 2.0 inches/second peak particle velocity as measured from any of three mutually perpendicular directions in the ground adjacent to off-site buildings shall not be exceeded.
(11) Millisecond-delay blasting shall be used to decrease the vibration level from blasting.
(d) Distance requirements.
(1) Soil or sand removal or extraction operations. Such uses shall not be established within 500 feet of a residential use or 200 feet of any other use.
(2) Quarries and open pit mines. Such uses shall not be established within 500 feet of a residential use or 200 feet of any other use.
a. The operational and removal area of such uses shall not be established within 500 feet of any property line.
(e) State permits. A copy of the state permit approval shall be maintained on file with the planning and community development department.
Historia
(Ord. of 10-13-2020)