Ir al contenido
Georgia Commons
Menú

Ben Hill County · Ordenanza de zonificación

Appendix B - ZONING / 10 - WATER RESOURCE DISTRICTS / 10-4 - Groundwater recharge area district.

10-4.4. Permitted uses.

Sobre este texto

  • As published by Municode, current through 2024-10-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The following are requirements for specific uses in the

Groundwater Recharge Area Protection District:

a. All above-ground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, shall have secondary containment for 110 percent of the volume of such tanks or 110 percent of the volume of the largest tank in a cluster of tanks. Such tanks used for agricultural purposes are exempt, provided they comply with all federal requirements.

b. New agricultural waste impoundment sites shall be lined if they are within:

1) A high pollution susceptibility area;

2) A medium pollution susceptibility area and exceed 15 acre-feet in size;

and

3) A low pollution susceptibility area and exceed 50 acre-feet in size.

As a minimum, the liner shall be constructed of compacted clay having a thickness of one foot and a vertical hydraulic conductivity of less than 5 x 10-7 cm/sec or other criteria established by the Natural Resources Conservation Service.

c. New homes served by a septic tank/drain field system shall be on lots having minimum size limitations as follows, based on application of Table MT-1 of the DHR Manual (hereinafter DHR Table MT-1). The minimums set forth in Table MT-1 may be increased further based on consideration of other factors (set forth in section A—F) of the DHR Manual.

1) One hundred fifty percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a high pollution susceptibility area;

2) One hundred twenty-five percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a medium pollution susceptibility area;

3) One hundred ten percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a low pollution susceptibility area.

d. New manufactured home parks served by septic tank/drain field systems shall have lots or spaces having minimum size limitations as follows, based on application of Table MT2 of the DHR Manual (hereinafter DHR Table MT-2). The minimums set forth in Table MT-2 may be increased further based on consideration of other factors (set forth in Section A-F) of the DHR Manual.

1) One hundred fifty percent of the subdivision minimum lot or space size calculated based on application of DHR Table MT-2 if they are within a high pollution susceptibility area;

2) One hundred twenty-five percent of the subdivision minimum lot or space size calculated based on application of DHR Table MT-2 if they are within a medium pollution susceptibility area;

3) One hundred ten percent of the subdivision minimum lot or space size calculated based on application of DHR Table MT-2 if they are within a low pollution susceptibility area.

e. Lots of record approved prior to the adoption of this ordinance are hereby exempted from the requirements of (C) and (D) above.

f. "No construction may proceed on a building or manufactured home to be served by a septic tank unless the County Health Department first approves the proposed septic tank installations as meeting the requirements of the Georgia Department of Human Resources Manual for On-Site Sewage Management (hereinafter DHR manual), and Sections 10-4.4(c) and (d) above."

g. New facilities which handle hazardous materials, of the types (listed in Section 312 of the Resource Conservation and Recovery Act of 1976, excluding underground storage tanks) and in amounts (10,000 pounds or more on any one day) shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements and any local fire prevention code requirements.

h. Permanent storm water infiltration basins shall not be constructed in areas having high pollution susceptibility.

i. Any new wastewater treatment basin shall have an impermeable liner.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:ben-hill-county/zoning/10-4.4@2024-10-08-fdb443f88c

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Ben Hill County Zoning Ordinance, 10-4.4. Permitted uses | Georgia Commons