10-5.5. Prohibited uses.

Sobre este texto

  • As published by Municode, current through 2010-11-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Handling areas for the receiving and storage of any hazardous waste.

B. Septic tanks and septic tank drainfields are prohibited within the river corridor, except as expressly provided in section 10-5.4A(4) dealing with single-family dwellings within the river corridor of this ordinance, which provides for septic tanks related to single-family dwellings.

C. Hazardous waste and solid waste landfills.

10-5.6 Exemptions. Berrien County exempts the following from the river corridor protection requirements:

A. Land uses existing prior to the adoption of the Alapaha River Corridor Protection District are exempt from these requirements, with the exception of industrial and commercial uses which must comply with the following two requirements:

1) Industrial and commercial activity shall meet all state and federal environmental rules and regulations.

2) Industrial and commercial activity shall not impair the drinking quality of the river.

B. Mining activities, if permitted by the DNR pursuant to the Georgia Surface Mining Act of 1968, as amended.

C. Utilities, (except as discussed above in [sub]section 10-5.4(B)). If such utilities cannot be located outside of the required buffer area, all installations and maintenance of the utilities shall be reviewed and approved by the [U.S. Army] Corps of Engineers.

D. Specific forestry and agricultural activities, except as discussed above in [sub]sections 10-5.4(C). and 10-5.4(H).

10-5.7 Restoration of buffer. The natural vegetative buffer shall be restored within 180 days following any land disturbing activity or construction within the river corridor.

10-5.8 Construction prohibited. Except as noted above, all construction within the buffer area shall be prohibited.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:berrien-county/zoning/10-5.5@2010-11-09-73995fcbce

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Berrien County Zoning Ordinance, 10-5.5. Prohibited uses | Georgia Commons