Bethlehem · Ordenanza de zonificación
Chapter 89 - UNIFIED DEVELOPMENT CODE / Article X - PROJECT DESIGN STANDARDS
Sec. 89-1178. Design exceptions and field changes.
Sobre este texto
- As posted on the city's website, retrieved 2026-11-11
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Request for design exception. When unique conditions and circumstances exist on a project, the developer's engineer may submit a request for design exception in a format provided by the Town or its designee. Design exceptions request should be identified as early as possible during the design process. The Town or its designee is the approval authority for design exceptions.
(b) Field changes. Minor changes in construction plans caused by field conditions shall be made at the direction of the Town or its designee with the cost of such changes to be paid by the developer. All changes are to be documented as revisions to the approved development plans and correctly shown on the as-built surveys.
Discrepancies between the as-built surveys and the approved development plans may result in delays in approving final plats or certificates of occupancy.
Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.