Sec. 89-1193. Sewerage system.
Sobre este texto
- As posted on the city's website, retrieved 2026-11-11
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Public sewerage system.
(1) Sewer lines shall be connected to the sanitary sewerage system of the appropriate providing jurisdiction and extended past each lot in accordance with all requirements.
(2) At the written instruction of the county health department, a connection to the public sewer shall be made within 90 days at the property owner's expense, and the individual on-site disposal system abandoned according to health department requirements.
(b) Private wastewater disposal.
(1) If a public sewerage system is not available nor under bid or contract to be available, each lot shall be provided with septic tanks or other on-site disposal systems in accordance with the regulations of the Barrow County Health Department, these development regulations and all other applicable laws and regulations.
(2) The owner of a septic tank leach field system shall operate and maintain the private wastewater disposal facility in a sanitary manner at all times at no expense to the Town Council. Communal on-site sewage disposal is prohibited.
(3) Privately financed wastewater disposal plants serving more than one residence or more than one property are prohibited.
a. If a property does not use an individual on-site sewage disposal system, it must be connected to a sewer leading to a public wastewater treatment facility except as follows:
b. A privately financed wastewater disposal plant serving a particular project or area may be approved by the board of commissioners and Town Council if the plant will be built to standards established by the County, operated by or under the direction of the county, and will become owned by the county and an interconnected part of the county system when such becomes available to the site.
(4) Atsuch time as a public sewer becomes available to a commercial/industrial property served by a private wastewater disposal system, a direct connection shall be made to the public sewer within 90 days in compliance with this article, and any septic tanks, cesspools, and similar private wastewater disposal facilities shall be cleaned of sludge and filled with suitable material.
(5) Safety. All excavations and operation areas for privately financed wastewater disposal systems shall be adequately guarded with barricades and lights so as to protect the public from hazard.