Blue Ridge · Ordenanza de zonificación
Part III - LAND USE CODE / Chapter 105 - BUILDING REGULATIONS / Article II - PERMIT PROCEDURES AND ENFORCEMENT
Sec. 105-28. Written documentation; payment of fee required for issuance.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Prior to issuance of any permit, in addition to the information requested on the permit application, the city clerk or his designated representative may require tests, plans and specifications, plats, and other written documentation from engineers, architects, surveyors, and other professionals to ensure that full compliance with all permitting requirements of the state minimum standard codes and applicable laws have been met. No permits shall issue on any project where the structure to be built or improved thereon is a special hazard structure or the use to be conducted therein is a special hazard use, without first obtaining the approval of building plans by the state fire marshal's office. Where a project is subject to permitting under the state soil erosion and sedimentation control law, no permit shall issue for any land disturbance activity, unless approved plans are received from the district soil conservation office and all required stabilization facilities are in place and ready for inspection. All buildings and structures intended for human occupancy shall have a safe source of drinking water and sanitary disposal. No permit shall be issued for any building or structure which does not have access to public water and sewer, unless plans for a well and/or septic tank have been approved by the county health department. All permits shall be conditioned upon the application and supporting data, which is deemed incorporated into and made a material part or term of the permission granted. No permit shall issue until all requisite fees have been paid in full.
Historia
(Ord. of 11-1-2005, § 150.12)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.