Ir al contenido
Georgia Commons
Menú

Blue Ridge · Ordenanza de zonificación

Part III - LAND USE CODE / Chapter 105 - BUILDING REGULATIONS / Article III - ADMINISTRATION AND ENFORCEMENT

Sec. 105-90. Inspections.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Existing building inspections. Before issuing a permit, the building official may examine or cause to be examined any building, electrical, gas, mechanical or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy.

He shall inspect all buildings, structures, and electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the construction codes.

(b) Manufacturers and fabricators. When deemed necessary by the building official, he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of the construction codes.

(c) Inspection service.The building official may make, or cause to be made, the inspections required by subsection (f) of this section. He may accept reports of inspectors of recognized inspection services, provided that, after investigation, he is satisfied as to their qualifications and reliability. A certificate called for by any provision of the construction codes shall not be based on such reports, unless the same are in writing and certified by a responsible officer of such service.

(d) Inspections prior to issuance of certificate of occupancy or completion. The building official shall inspect, or cause to be inspected, at various intervals, all construction or work for which a permit is required, and a final inspection shall be made of every building, structure, or electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion.

(e) Posting of permit. Work requiring a permit shall not commence until the permit holder or his agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the building official or representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the building official.

(f) Required inspections. The building official, upon notification from the permit holder or his agent, shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the construction code:

(1) Building.

a. Foundation inspection. To be made after trenches are excavated and forms erected.

b. Frame inspection. To be made after the roof, all framing, fireblocking and bracing are in place, and all concealing wiring, all pipes, chimneys, ducts and vents are complete.

c. Final inspection. To be made after the building is completed and ready for occupancy.

(2) Electrical.

a. Underground inspection. To be made after trenches or ditches are excavated, after conduit or cable installed, and before any backfill is put in place.

b. Rough-in inspection. To be made after the roof, framing, fireblocking and bracing is in place and prior to the installation of wall or ceiling membranes.

c. Final inspection. To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy.

(3) Plumbing.

a. Underground inspection. To be made after trenches or ditches are excavated, after piping installed, and before any backfill is put in place.

b. Rough-in inspection. To be made after the roof, framing, fireblocking and bracing is in place and all soil, waste and vent piping is complete, and prior to the installation of wall or ceiling membranes.

c. Final inspection. To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.

d. Note: See section 311 of the Standard Plumbing Code for required tests.

(4) Mechanical.

a. Underground inspection. To be made after trenches or ditches are excavated, after underground duct and fuel piping installed, and before any backfill is put in place.

b. Rough-in inspection. To be made after the roof, framing, fireblocking and bracing are in place and all ducting and other concealed components are complete, and prior to the installation of wall or ceiling membranes.

c. Final inspection. To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy.

(5) Gas.

a. Rough piping inspection. To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected.

b. Final piping inspection. To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test.

c. Final inspection. To be made on all new gas work authorized by the permit and such portions of the existing systems as may be affected by the new work or any changes in order to ensure compliance with all the requirements of the construction codes and to ensure that the installation and construction of the gas system is in accordance with the reviewed plans.

(6) Energy.

a. Foundation inspection. To be made before slab concrete is poured in place. To verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required.

b. Frame inspection. To be made before exterior wall insulation is concealed by wall board to check installation of exterior walls insulation and to inspect that all holes and cracks through the structure envelope have been sealed in an appropriate manner as to restrict air passage.

c. Final inspection. To be made after the building is completed and ready for occupancy. To verify installation and R-value of ceiling and floor insulation. To verify correct SEER ratings on appliances.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 11-1-2005, exh. A, § 1.27)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:blue-ridge/zoning/105-90@2026-11-11-4f37e49c37

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Blue Ridge Zoning Ordinance, Sec. 105-90. Inspections | Georgia Commons