Blue Ridge · Ordenanza de zonificación
Part III - LAND USE CODE / Chapter 140 - ZONING / Article XIII - BUFFER, LANDSCAPING AND TREE PROTECTION REQUIREMENTS
Sec. 140-385. Tree protection.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) In the land development process, no more than 75 percent of the mature, healthy, existing trees ten inches DBH or greater shall be cut, damaged, or destroyed. Provided, however, that additional trees may be removed upon approval by the City Administrator or designee if a minimum of three 2½-inch caliper tree or larger is planted and maintained for three years for each one tree removed in excess of ten inches
DBH.
(b) See Sec. 140-376 for required information to be submitted with a landscape plan to ensure compliance with this section.
(c) During excavation, filling, construction, or demolition operations, each tree or stand of trees to remain on the property shall be protected against damage to bark, roots, and low hanging branches with a fence enclosing the critical root zone. Fencing shall be either plastic construction area fencing, silt fencing, or high visibility surveyors' tape on one-inch by two-inch posts.
Historia
(Ord. No. BR2023-20, § 2(Exh. B), 8-15-2023)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.