Bogart · Ordenanza de zonificación
Article 10 - Project Design and Construction Standards / Division I - PROJECT DESIGN
Sec. 1012.03. Installation and construction standards for driveways.
Sobre este texto
- As posted on the city's website, retrieved 2026-11-14
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. When required, a minimum pipe size of 15 inches and minimum 20-foot length of pipe must be used for all driveway construction. A minimum pipe size of 18 inches must be used for all cross drains under public roads.
b. Pipe for driveways shall be either 16 gauge-corrugated steel or aluminum in accordance with City standards. Reinforced concrete may be used as well. Smooth-lined HDPE pipes are also permitted within City right of way. Driveways requiring curb and gutter removal shall be installed in accordance with instructions and diagrams issued by the City Engineer/ Public Works at the time of the application for permit.
c. Portions of driveways located within the right-of-way of a public street or within a private street easement shall not consist of specialty or decorative type construction such as stamped concrete or brick pavers.
Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.