Bogart · Ordenanza de zonificación
Article 10 - Project Design and Construction Standards / Division II - PROJECT CONSTRUCTION
Sec. 1018.03. As-built data.
Sobre este texto
- As posted on the city's website, retrieved 2026-11-14
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. Upon completion of the development activity as authorized by the development permit and prior to final development inspection of public and private improvements, the owner shall submit to the City Engineer/ Public Works Director and the Water Resources Director, as appropriate, for review and approval a complete set of record drawings showing “as-built” conditions prepared by the design professional of record who prepared the original plans, or a professional land surveyor, engineer or landscape architect licensed in the State of Georgia. These drawings shall show the following:
(1) Street centerlines and rights-of-way lines.
(2) Drainage system pipes, manholes and channels, including finished elevations.
(3) Storm water detention facilities including finished elevations.
(4) Sanitary sewer system (if any) including finished elevations.
(5) Water system and reuse water system (if any) including finished elevations.
(6) All other information as required by the City Engineer/ Public Works Director and Water Resources Director.
b. The as-built data shall be certified and sealed by the design professional of record or other professional preparer, subject to the tolerances of accuracy indicated in the certification.
c. Refer to Sec. 1231, digital submission requirements: as-built data and final plats, for additional “as-built” requirements.
Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.