Ir al contenido
Georgia Commons
Menú

Bogart · Ordenanza de zonificación

Article 11 - Erosion Control and Stormwater Management / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT

Sec. 1116.03. Standards for stormwater management.

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-14

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. All development and/or construction within urbanized area of City of Bogart shall meet requirements of the Georgia Stormwater Management Manual, Vol. 2, unless otherwise specified in this Division.

b. Facilities for the management of stormwater discharges shall be designed and constructed in a manner that enhances and protects the natural beauty and aesthetic qualities of City of Bogart as follows:

(1) Any required retention and/or detention areas shall not be developed.

(2) Any required retention and/or detention areas shall be incorporated into the common areas of the residential development or incorporated into individual lots.

(3) The local government maintains the right, but not the responsibility, to access retention and/or detention areas for purposes of maintenance and inspection

(4) Appropriate vegetation shall be planted in all retention and/or detention areas.

(5) Where fencing is required under Section 1116.03.c, evergreen vegetative screening shall be provided with a minimum height of 3 feet at time of planting. Plant materials used for such screening must be in compliance with Table 8.2 of this Development Code.

c. Fences a minimum of 4 feet in height with a minimum 8 foot wide gate will be required on all detention ponds where:

(1) The sides of the pond have a slope greater than 3 horizontal to 1 vertical, or

(2) The depth of water in the pond is greater than 3 feet at one hour after the duration of any storm event up to the 50-year event.

d. Drainage easement requirements.

(1) The minimum easement width for an open ditch where a pipe is feeding into the ditch will be determined as follows:

Table 11.1: Drainage Ditch Easement Widths Pipe Size Feeding Into Ditch Minimum Easement Width 15 to 30 inches 20 feet 36 to 66 inches 30 feet 72 inches and greater 40 feet

(2) Where a subdivision is traversed by a watercourse, drainage way or stream, there shall be a drainage and access easement conforming substantially with the lines of such watercourse, and such further width as will be adequate for the purpose of drainage and maintenance, taking into account possible future development of higher land in the same drainage area, in accordance with Table 11.1 above, or bank plus 20 feet. Such drainage way shall be piped when the City Engineer/ Public Works Director shall find that it is a hazard or that a continual maintenance problem might exist.

(3) If the drainage way is totally piped, the easement width shall be based on the associated pipe size above.

e. If any stormwater management system proposes to utilize the roadway embankment for the temporary impoundment (detention) of stormwater then additional engineering analysis and approved mitigation measures as determined on a case-by-case basis by the City Engineer/ Public Works Director will be required to ensure the protection of the roadway system during all storm events in order to qualify for the exemption contained in the Private Bridges and Dams on Roadways Section of the Project Design and Construction Standards Article of this Development Code.

Said analysis and mitigation measures shall include but are not limited to;

(1) No impounded surface water elevation shall encroach into any portion of the public right-of-way, any utility easement/corridor, or any utility easement/corridor on private street easements

(2) The 100-year water surface elevation must maintain a minimum of 3 vertical feet of freeboard from the lowest roadway elevation traversing the embankment.

(3) The roadway embankment must be protected from seepage, erosion, and undermining from any impoundment of water. Examples of protection measures may include but are not limited to anti-seep collars, special engineered embankment construction, and embankment armoring. At a minimum, embankment armoring protection measures shall be incorporated beginning at the highest water surface elevation calculated at 4.0 hours after the beginning of the storm event for all analyzed return frequencies including the 100 year event. The embankment armoring shall extend to the bottom of the impoundment facility. The City Engineer/ Public Works Director may require additional protection measures based on maintenance needs or critical infrastructure protection needs.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bogart/zoning/1116.03@2026-11-14-e805e24ee5

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bogart Zoning Ordinance, Sec. 1116.03. Standards for stormwater management | Georgia Commons