Bogart · Ordenanza de zonificación

Article 11 - Erosion Control and Stormwater Management / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT

Sec. 1116.07. Materials and installation.

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-14

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. Pipes.

(1) Pipe material shall be determined based on type of installation, as set forth in Table 11.2: Selection Guidelines for Storm Sewer Piping. All pipes shall be new and unused.

(2) The gauge or class of pipe used shall be determined by acceptable methods using H-20 highway loading, and shall meet Georgia D.O.T. Specifications. The City Engineer/ Public Works Director, or his/her duly appointed representative, shall inspect the pipe before installation to assure that it is free of cracks or damage. All damaged, used, or “second” quality pipe shall be refused and immediately removed from the job site.

b. Joints and installation.

(1) Reinforced concrete pipe joints must be properly constructed to prevent exfiltration.

(2) The use of O-rings or sealants may be required, depending on pipe design.

(3) All storm sewer piping shall be constructed in a linear approach with no vertical or horizontal variance from the approved design.

(4) High density polyethylene (HDPE) and corrugated metal pipe (CMP) shall be joined by manufacturer’s recommended pipe banding materials. All trench lines shall be thoroughly compacted prior to pipe installation. HDPE pipe will require special bedding and installation in strict accordance with manufacturer’s specifications and as directed by the City Engineer/ Public Works Director.

Table 11.2: Selection Guidelines for Storm Sewer Piping Type of Pipe Installation Reinforced Concrete Pipe

(RCP)

Corrugated Steel

AASHTO M-36

Corrugated Aluminum

AASHTO M196

Plastic

AASHTO

M-294 Reinforced Concrete Box Culvert Per GDOT Standards Aluminized Type II

CMP

Bituminous Coated

CMP

Aluminum Alloy CMP Corrugate d HDPE Smooth Lined Longitudinal Grade Less Than 10% Yes Yes Yes Yes Yes (1) --- Longitudinal Grade Over 10% No Yes Yes Yes Yes (1) --- Cross Drain Less Than 250

ADT

Yes Yes Yes Yes Yes (1) --- Cross Drain Greater Than

250 ADT

Yes No No No No --- Cross Drain Flowing Stream Application Yes (3) No Yes Yes (1) (4) --- Cross Drain 25 Yr Flow >

200 CFS

or Fill Depth > 18 ft

(2) No No No No Yes Conditional Uses:

(1) Corrugated high density polyethylene pipe smooth lined type “S” must be manufactured and installed in strict compliance with the manufacturer’s recommendation. Special backfill and bedding are required per the direction of the City Engineer/ Public Works Director. Prior approval of the City Engineer/ Public Works Director is required.

(2) Reinforced concrete box culverts are required under excessive flow and/or fill depth conditions.

Approved pipe materials may be utilized in some instances based on the City Engineer/ Public Works Director’s assessment of existing conditions and future maintenance requirements.

(3) The addition of a type “A” full bituminous coating with paved invert is required for this application.

(AASHTO M-190)

(4) Requires approval of City Engineer/ Public Works Director based on assessment of existing conditions and future maintenance requirements.

c. Only reinforced concrete pipe shall be used within street right-of-way on arterial roads.

Reinforced concrete pipe shall be used on all cross drains crossing under the roadway for major and minor collectors. Concrete pipe shall not be used on grades exceeding 10%.

Metal pipe may be used within the rights-of-way of local streets and for driveway culverts.

Metal pipe shall either be corrugated steel (AASHTO M-36) with aluminized Type II or bituminous coating or corrugated aluminum alloy pipe (AASHTO M-196).

d. Unless otherwise specifically set forth in this code, all of the materials, methods of construction, and workmanship for the work covered in reference to stormwater drainage construction shall conform to the latest standard specific specifications of the Georgia Department of Transportation.

e. Pipe installation shall conform to Georgia D.O.T. Standard Specifications for construction of roads and bridges. Before any traffic over a storm drain is allowed, the developer shall provide an adequate depth and width of compacted backfill to protect the structure from damage or displacement. The developer shall remove any debris or silt that constricts the flow through a pipe as of as necessary to maintain drainage. All pipe structures shall be cleaned before the work is accepted. Any damage or displacement that may occur due to traffic or erosion shall be repaired or corrected at the developer’s expense.

f. Trench construction for storm drainage pipe shall be in accordance with State Highway Standard 1030D (or most current) or as directed by the City Engineer/ Public Works Director.

g. Storm drainage pipe shall be bedded in Type 57 gravel where wet conditions are encountered.

h. Backfilling of trenches shall be accomplished immediately after the pipe is laid. The fill around the pipe shall be placed in layers not to exceed 6 inches with each layer being thoroughly compacted. All material shall have an in place density of 98% modified proctor to a depth of 6 inches below the finished grade, and 95% modified proctor at depth greater than 6 inches below the finished grade. Compaction requirements shall be attained by the use of mechanical methods. Each layer of backfill shall be placed loosely and thoroughly compacted in place.

i. All backfill shall be non-plastic in nature, free from roots, vegetative matter, waste, construction material or other objectionable material. Said material shall be capable of being compacted by mechanical means and shall have no tendency to flow or behave in a plastic manner under the tamping blows.

j. Material deemed by the City Engineer/ Public Works Director as unsuitable for backfill purposes shall be removed and replaced with selected backfill material.

k. Water shall not be permitted to rise in trenches that are not backfilled after the pipe has been placed.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bogart/zoning/1116.07@2026-11-14-322fc554cf

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bogart Zoning Ordinance, Sec. 1116.07. Materials and installation | Georgia Commons