Bogart · Ordenanza de zonificación

Article 11 - Erosion Control and Stormwater Management / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT / 1117 - Stormwater management in the non-urbanized area.

Sec. 1117.04. Storm drainage design considerations.

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-14

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

An adequate system based upon at least a 25-year storm event shall be provided for the proper drainage of all surface water originating in or affecting the subdivision.

a. Stormwater inlets shall be designed and located so as not to exceed a maximum gutter spread width of half the travel lane based on flow data calculations for the 10-year storm event.

b. The drainage system shall conform to any City storm drainage master plan which may be adopted and shall include necessary curbing, pipes, culverts, headwalls, drop inlets, bridges, swale ditches, or any other type of drainage facility needed to control the flow of water in, around, or through the subdivision.

c. Pipe size will be determined by utilizing the Rational Method or the Soil Conservation Service Method (TR-55) to compute peak runoff. A 25-year storm event will be used to determine all pipe sizes. Hydraulic grade line shall not exceed 90% of the diameter of the pipe. All cross drains and culverts under roadways shall be sized based on a 50-year storm event. All proposed piping within a FEMA identified floodplain shall be sized to adequately convey the 100-year frequency storm event.

d. Manning’s equation shall be used to evaluate hydraulic capacity and velocity of flow within the storm drainage system. Required storm pipes shall be designed to maintain a water flow velocity greater than or equal to 3 feet per second. The hydraulic analysis of culverts shall be based on Federal Highway Administration engineering practice and take into account the inlet geometry, slope, size, roughness, and approach or tailwater conditions.

Stormwater inlets shall be designed in accordance with Federal Highway Administration engineering practice and constructed in compliance with Georgia D.O.T. construction standards and shall be Georgia D.O.T. Standard 1033, 1034, and 1019. Drainage calculation and design data are required for all stormwater conveyance systems and structures. All drainage structures shall be constructed of reinforced precast concrete, 4 foot diameter or larger. All 1033D and 1034D drainage structures shall require a reinforced precast “Round to Square” adapter for additional throat support. All junction boxes shall include precast adapters and heavy duty traffic rated ring and covers. All manholes shall include approved steps, spaced 12 inches on center vertically, to allow safe access by maintenance personnel. All structures shall have paved inverts.

e. In certain instances where rolled or “Hollywood” curb is utilized, the City Engineer/ Public Works Director may require the use of 1033F and 1034F catch basins.

f. Energy dissipation devices, such as splash pads, rip rap, stilling basins, etc., shall be provided at the outlet of every culvert and piped discharge system. The size and type of energy dissipation device to be used shall be designed in accordance with sound engineering practices and this Division.

g. All drainage ditches that are between building lots shall be piped to the rear property line.

This shall be done at the expense of the developer.

h. Any routed stormwater shall attain sheet flow by the property line.

i. Discharge structures that are within close proximity to adjoining properties or the public right-of-way shall be screened from view.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bogart/zoning/1117.04@2026-11-14-2bb5d2bb79

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bogart Zoning Ordinance, Sec. 1117.04. Storm drainage design considerations | Georgia Commons