Article 3 - Restrictions on Particular Uses / Division II - RESTRICTIONS ON CERTAIN PRINCIPAL USES / 343 - Utility substations and solar energy systems.

Sec. 343.05. Solar energy farm installation and construction.

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-14

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. Mounting.

(1) Solar panels or solar arrays shall be mounted onto a pole, rack or suitable foundation, in accordance with manufacturer specifications, in order to ensure the safe operation and stability of the system. The mounting structure (fixed or tracking capable) shall be comprised of materials which are able to fully support the system components and are approved by the manufacturer, in accordance with applicable building permit requirements. Electrical components of the facility shall meet applicable electrical code requirements, and all electrical wires and lines less than 100kV that are used in conjunction with the solar energy facility shall be installed underground.

(2) Multiple mounting structures shall be spaced apart at the distance recommended by the manufacturer to ensure safety and maximum efficiency.

b. Setbacks.

A solar energy farm and its accessories and structures shall be set back a minimum of 50 feet from all property lines and 100 feet from any residence.

c. Placement.

No structure may be installed within a state or local state waters buffer or within conservation corridors. If located in a floodplain or an area of known localized flooding, all panels, electrical wiring, automatic transfer switches, inverters, etc. shall be located 3 feet above the base flood elevation. All wiring or transmission points within the floodplain shall be NEMA 3R or watertight.

d. Screening.

The facility shall be fully screened from adjoining properties and adjacent roads using the natural topography or by installation of an evergreen buffer capable of reaching a height of 6 feet within three years of planting, with at least 75% opacity at the time of planting.

e. Height.

(1) Freestanding solar panels or solar arrays shall not exceed 25 feet in height as measured from the grade at the base of the structure to the highest point.

(2) Mounted solar panels or solar arrays shall not exceed eight feet above the apex of the structure on which it is mounted.

f. Security.

(1) Unless 24-hour security guards or video surveillance is provided at the installation, the solar energy facility shall be enclosed by a security fence no less than 6 feet and not greater than 8 feet in height.

(2) Access gates and equipment cabinets must be locked when not in use.

(3) Signs shall be installed on all gates, and every 50 feet of the security fencing stating, “DO NOT ENTER – SOLAR POWER GENERATING FARM.”

g. Noise.

Inverter noise shall not exceed 40dBA, measured at the property line. Mitigation noise barriers may be approved on an individual basis by the Development Review Committee.

h. Lighting.

If lighting is required, it shall be activated by motion sensors. Lighting shall be fully shielded and downcast so that light does not spill onto any adjacent property or into the night sky.

i. Maintenance and upkeep.

Systems shall be maintained in accordance with manufacturer’s specifications. The operator of the facility shall maintain the facility, including all buffer screening, in compliance with the approved plans and shall keep the facility free from weeds, dust, trash and debris.

j. Site Plan Review and Development Permit.

A site plan reviewed and approved by the Development Review Committee shall be required prior to issuance of a development permit. In addition to requirements for site plans generally, the site plan submission shall include the following information: The proposed location and dimensions of all solar panels, inverters, existing and proposed structures, screening, fencing, property lines, parking, access driveways and turnout locations, ancillary equipment, transmission lines, vegetation, the location of any residences on site and within 100 feet of the perimeter of the facility, the location of any proposed solar access easements, and standard drawings of solar energy system components, including engineered drawings and documentations for footings and array structural supports.

k. Additional submission requirements.

In addition to requirements for information to be provided during the site plan review and development permitting process, the facility shall not be approved for operation until the following are submitted:

(1) Copy of all lease agreements and solar access easements.

(2) Where interconnection to an electric utility grid is proposed, the applicant shall submit evidence that the electrical utility provider has been informed of the customer’s intent to connect with the local electric utility grid. A copy of the approval from the utility company providing connection to the grid must also be provided before operation of an interconnected facility will be authorized.

(3) A decommissioning plan for the anticipated service life of the facility or in the event that the facility is abandoned or has reached its life expectancy.

(4) The City may require other studies, reports, certifications, and/or approvals be submitted by the applicant to ensure compliance with this section.

l. Removal of obsolete or unused systems.

(1) All obsolete or unused systems shall be removed. Any structure or equipment associated with the solar farm that is not operated for a continuous period of one year shall be considered an obsolete or unused system and decommissioned per the approved decommission plan.

(2) The site shall be restored to as natural a condition as possible within six (6) months of the removal.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bogart/zoning/343.05@2026-11-14-ccd233065d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.