Sec. 813.01. Installation of plant materials.
Sobre este texto
- As posted on the city's website, retrieved 2026-11-14
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. Plant materials, as required by the provisions of this Article, shall be installed prior to issuance of a Certificate of Occupancy. The Planning Director may allow one planting season in a twelve month period in which the installation of plant materials shall be completed, subject to the performance security requirements, below.
b. Performance surety.
(1) In such cases as when planting stock availability is low or weather conditions are not appropriate for planting new trees, the project owner may postpone planting for up to 6 months; provided that performance security is posted with the City of Bogart in accordance with the following criteria:
(a) Security shall be in cash held in escrow or an irrevocable letter of credit submitted to the Planning Department, with the appropriate documentation.
(b) Security shall be provided in an amount equal to 110 percent of the cost of materials, installation and 2-year guarantee as demonstrated by a signed contract between the owner and a qualified landscape contractor, and as approved by the Planning Director.
(2) An inspection shall be made by the Planning Department of all tree plantings to assure compliance with plan requirements prior to release of the performance security. The performance security will be drawn upon by the City of Bogart at the time of expiration if the planting requirements have not been fulfilled, or if the owner has not requested an extension. One 6-month extension may be permitted with documented justification acceptable to the Planning Director. Any inspections performed after the final inspection (for project release) are subject to re-inspection fee schedules.
c. Maintenance bond.
(1) Prior to approval of a final subdivision plat or issuance of a certificate of occupancy, or prior to release of a performance surety provided under this Section (whichever last occurs), a maintenance bond, letter of credit or escrow account in a form acceptable to the Planning Director is required for all plant materials installed as a result of the requirements of this Article. The developer shall be responsible for Sec. 813 Installation and maintenance of plant materials.
maintenance of all such plant materials for 2 years from the date of acceptance of the maintenance bond.
(2) The value of the Maintenance Bond shall be equal to 25 percent of the actual cost of installation of the plant materials. The cost of installation shall be evidenced by copies of contractor agreements or actual invoices paid, or as otherwise determined by the Planning Director in accordance with generally established costs for the industry.