Appendix B - Environmental Areas Protection and Review

Appendix B. Environmental Areas Protection and Review

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-14

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(1) An environmental areas review to ensure compliance with the provisions of this section shall be conducted in conjunction with the review of the following applications for activity that is proposed to occur within the 100-year floodplain, riparian buffer areas, including protected rivers, wetlands, or significant groundwater recharge areas.

(a) Plats combining the full extent of two or more lots to create a single lot.

(b) Preliminary subdivision plats.

(c) Any proposed change of use of any property. Change of use, as used herein, shall be defined in a manner consistent with that employed in the administration of the zoning and development ordinances for each jurisdiction in which the property is located.

(d) Any proposed water treatment facility, purification facility, or stormwater management facility.

(e) Road and utility construction.

(f) Excavation and fill where the fill or excavation combined is equal to or greater than ten cubic yards.

(g) Any work requiring a zoning permit or land disturbance activity permit, but not for work that only requires permits for ordinary repair and maintenance or work that occurs entirely within the interior of a building or structure but does not entail a change of the use of the building or structure.

(h) Any substantial clearing of vegetation which alters the nature and characteristics of the existing vegetation on site unless the clearing meets the definition of timber production or agriculture.

(i) Any increase in impervious surface equal to or more than either ten percent of the existing impervious surface on the existing lot of record or 10,000 square feet, whichever is less.

(j) Construction of a dam or any other impoundment.

(2) An environmental areas review permit is not required for the following activities:

(a) Ordinary maintenance of buildings and yards, planting and maintenance of non-commercial home gardens and the cutting of firewood for personal use provided that no live trees are removed within 25 feet of a stream bank.

(i.e., fewer than two cords of wood per year). Routine repair and maintenance of existing roadways and utility facilities.

(b) Timber production, surface mining, granite quarry. Although not requiring an Environmental Areas Review Permit, all activities associated with timber production shall comply with the best management practices as specified in Georgia's Best Management Practices for Forestry available from the Georgia Forestry Commission. All activities associated with timber production, surface mining, or granite quarry shall not impair the quality of the water as defined by the Federal Clean Water Act, and shall comply with all state and federal laws and all regulations promulgated by the Georgia Forestry Commission.

(c) Any action taken by a governmental entity in an emergency to mitigate an existing or potential hazard.

(d) Any land-disturbing activities conducted by any electric membership corporation or any public utility under the regulatory jurisdiction of the Public Service Commission.

(e) Agricultural production and management. Although not requiring an environmental areas review permit, all agricultural production and management shall comply with the best management practices established by the Georgia Soil and Water Conservation Commission, shall not impair the quality of the water as defined by the Federal Clean Water Act, and shall comply with all state and federal laws and all regulations promulgated by the Georgia Department of Agriculture, including the best management practices established by the Natural Resources Conservation Service.

(f) Existing buildings, structures or on-going land-use activities do not require an environmental areas review as long as at the time of construction the existing building or structures obtained the appropriate construction related permits (i.e., building permits). An environmental areas review permit shall be required if the previously permitted land-use activities have ceased for a period of more than one year.

(3) Applications and plans required: A complete application and the following plans are required for any activity that meets the thresholds established above:

(a) A site plan containing the following information:

1. The location and extent of environmental areas, as established herein.

Plans shall indicate the extent and boundaries of floodplain, riparian buffers, wetlands, or significant groundwater recharge areas. The applicant may request the department to field verify the applicant's delineation of protected streams and buffers. The field review by the department will be valid for up to six months.

2. The location and extent of topography, with areas having slopes greater than 25 percent delineated.

3. The location and extent of all existing non-natural features including buildings, structures, foundations, parking areas, driveways, walls, and fences.

4. The location and extent of any easements or other physical encumbrances on the property.

5. The location and extent of all proposed construction including clearing, construction of buildings, impervious surfaces (driveways, paving, patios and sidewalks), roads, walls, fences and other accessory structures.

6. Buildable area.

(b) As part of the application process, the boundaries of all environmental areas shall be clearly marked in the field for review during routine site inspections and shall remain clearly marked for the duration of the proposed activity.

Ongoing activities shall be marked in a manner approved by staff.

(c) The application and plans shall clearly demonstrate how the proposed activity within the environmental areas meets the requirements of this chapter.

(d) Criteria for approval. An application for an environmental areas review permit shall be issued by the planning director when the applicant demonstrates the following:

1. That all environmental areas have been properly identified and indicated on the plans submitted.

2. That the proposed activity is in compliance with the requirements of this section.

(4) Riparian Buffers.

(a) Riparian buffers within the 78/316 Special District Overlay zone must observe a minimum buffer of 75 feet (measured horizontally from uppermost part of the river, stream or lake bank usually marked by a break in slope) from all perennial and intermittent rivers, lakes, and streams.

(b) Permitted Activities.

1. Subdivisions of land: All lots modified by lot line adjustments or new lots created from existing lots which contain protected environmental areas must demonstrate that the proposed lots contain a buildable area of sufficient size to accommodate a single-family dwelling, regardless of the extent of the uses allowed by the underlying zoning. The demonstration of the buildable area does not establish or secure the ability of the owner or subsequent owners to construct on the site.

2. Stormwater treatment facilities or purification facilities.

3. The restoration or enhancement of riparian buffers must meet the federal and state standards and be conducted in accordance with state and federal standards and guidelines.

4. Measures to remove or abate nuisances or any other violation of state or federal statute, administrative rule or local ordinance must demonstrate that manner of removal or abatement does not create a further negative impact on the riparian buffers or violate additional local ordinances.

5. New transportation or utility stream crossings must meet the following criteria:

a. Water and sewer lines must run parallel to existing streams and rivers. The location of water and sewer lines shall be located as far from the bank as the physical constraints of the site allows.

b. All crossings shall be made at a right angle unless demonstrated that a right angle is not feasible.

c. The installation and maintenance of the facility shall be conducted in such a manner as to protect the integrity of the floodplain area. An installation and maintenance plan shall accompany the environmental areas review application.

d. Construction of transportation and utilities shall meet all requirements of the Erosion and Sedimentation Control Act as amended.

e. Utilities shall not impair the drinking quality of the water, as defined by the Federal Clean Water Act, as amended.

6. Criteria for clearing vegetation within the riparian buffer for permitted activities:

a. Native vegetation shall be retained, protected, and supplemented within the environmental area. Limited non-mechanical clearing of vegetation is allowed within riparian buffer, provided that the vegetation removed is less than six-inch (DBH) and is not within 25 feet of the stream bank.

b. No removal of living trees within 25 feet of the stream bank.

(c) Prohibited activities within riparian buffers.

1. Any new structures, land disturbance activities, or impervious surfaces other than those specifically permitted in this chapter.

2. Handling areas for the receiving and storage of hazardous waste as defined by the State of Georgia.

3. Hazardous waste and solid waste landfills.

4. Agricultural waste pits.

5. Parking lots.

6. Those activities not specifically listed in the preceding section.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bogart/zoning/appendix-b@2026-11-14-a65cdfa1fa

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bogart Zoning Ordinance, Appendix B. Environmental Areas Protection and Review | Georgia Commons