Ir al contenido
Georgia Commons
Menú

Bowdon · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 16 - FLOODS / Article II - FLOOD DAMAGE PREVENTION / Division 3 - DEVELOPMENT STANDARDS

Sec. 16-90. Engineering study requirements for floodplain encroachments.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions of section 16-116 apply. This study shall be prepared by a currently registered professional engineer in the state and made a part of the application for a permit. This information shall be submitted to and approved by the city prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. Such study shall include:

(1) Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development;

(2) Step-backwater analysis, using a FEMA-approved methodology approved by the city. Crosssections (which may be supplemented by the applicant) and flow information will be obtained whenever available. Computations will be shown duplicating FIS results and will then be rerun

with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles;

(3) Floodplain storage calculations based on cross-sections (at least one every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and futureconditions floodplain storage capacity would not be diminished by the development;

(4) A preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 5-1-2016(2), att. (604.4), 6-13-2016)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bowdon/zoning/16-90@2026-11-11-7251a3e8ed

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bowdon Zoning Ordinance, Sec. 16-90. Engineering study requirements for floodplain encroachments | Georgia Commons