7.2. Sign Permit Required

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-11

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Except as specifically exempted from the provisions of this article, it is unlawful for any person to post, display, substantially change, or erect a sign without first having obtained a sign permit or any other permit required by this Development Code. A change in only the content of a sign without changes to the sign structure, height, type, or area does not constitute a substantial change.

A. Permits for Existing Signs Existing signs that conform to the provisions of this article and would be required to obtain a permit under the regulations of this article must register with the Planning Director and pay a permit fee. Registration and payment of the fee must be completed within one year of the effective date of this article for all signs that do not have a valid permit issued under a previous sign ordinance. The information provided for registration will be the same information required for a new sign permit application. No permit fee will be required for the registration of existing signs that have a currently valid permit issued under a previous sign ordinance.

B. Owner’s Consent Required No sign may be permitted or posted on a property without the consent of the property’s owner or authorized agent. If it is determined that a sign was erected on a lot pursuant to an alleged agent’s incorrect representation that the record owner of the lot, in fact, gave permission for the erection of a sign, the permit for that sign will be revoked.

C. Permit Application Requirements Sign permit applications must be filed by the sign owner or the owner’s agent to the

Planning Director on forms provided by the Town. The application must include all of the following.

1. The address of the property on which the sign is to be located.

2. The name(s) and address(es) of the owner(s) of the property on which the sign is to be located.

3. The written consent of the owner or the owner’s agent granting permission for the placement and maintenance of the sign.

4. The name, address, telephone number, and business license number of the sign contractor.

5. A to-scale drawing showing the dimensions, materials, color, total sign area, and total sign frame and structure area.

6. An explanation of how the sign is to be mounted or erected, including necessary

structural and construction details (or shop drawings) as appropriate.

7. Electrical plans showing how the sign is to be illuminated (if applicable).

8. A site drawing showing the area of the property, location of any existing buildings, and proposed sign location.

9. Any other information deemed necessary by the Planning Director to review the sign for compliance with the requirements of

this article.

10. An agreement to indemnify and hold harmless the Town for all damages, demands, or expenses in any manner caused by the sign or sign structure. A certificate of liability insurance may be required prior to the issuance of a sign permit.

11. Each application must be accompanied by a fee determined by a schedule of fees adopted by the Town Council from time to time.

D. Compliance With Other Permits The applicant must obtain all other permits or licenses required by Town ordinances, state law, or other regulations.

E. Permit Decision Time Limit A sign permit must be issued or denied by the Planning Director within 30 days of the filing of a complete application, payment of the appropriate fee, and compliance with all requirements of this Development Code. If the Town fails to act within this 30-day period, the permit will be deemed to have been approved.

In the event that a permit application is denied, the Planning Director must provide the applicant a written denial, indicating the reason(s) for denial.

F. Permit Time Limitation A sign permit becomes null and void if the sign for which the permit was issued is not

completed and fully installed within six months after the date of issuance. No refunds will be made for fees paid for permits that expired due to failure to erect a permitted sign. If a person later desires to erect a sign at the same location, a new application must be processed and another fee paid.

G. Enforcement If any sign is or is proposed to be erected, constructed, altered, maintained, converted, or used in violation of any provision of this article or any other applicable ordinance including, but not limited to, building and electrical codes, the Planning Director or their designee may issue a written notice to the owner of the sign. The owner will have 10 days in which to bring the sign into compliance. If the sign has not been brought into compliance within 10 days, the Town Manager may give the owner an additional 20 days to bring the sign into compliance. If not corrected during this additional 20-day period, the Planning Director or their designee may issue a citation or proceed with any other legal remedy.

H. Signs in Right-of-Way The Planning Director, any Town employee, or any person contracting with the Town for such purpose may, without notice, remove and

dispose of any prohibited sign, signal, device, or other structure erected, placed or

maintained on the dedicated right-of-way of any public road. The removal and disposal of a prohibited sign, signal, device, or other structure will not preclude the prosecution of any person for erecting, placing or maintaining such item in the dedicated public right-of-way.

Leer este código donde se publica (city website (Revize)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:braselton/zoning/7.2@2026-11-11-f50ce0d63b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Braselton Zoning Ordinance, 7.2. Sign Permit Required | Georgia Commons