Braselton · Ordenanza de zonificación
Article 7 - SIGNS
7.8. Signs Requiring a Temporary Sign
Sobre este texto
- As posted on the city's website, retrieved 2026-11-11
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Permit The following types of signs require a temporary sign permit in all zoning districts.
A. Banners
1. Each temporary sign permit authorizes one banner at a time.
2. No more than one banner may be displayed per establishment.
3. A banner may be displayed for no more than 10 days at a time and for no more
than four 10-day periods per calendar year.
4. No banner may be larger than 32 square feet.
5. No banner may be more than 5 feet in height above ground level.
6. Banners must be erected with supports or other means so that they do not sag.
7. Banners must be maintained in good condition.
B. Pennants, Feather Signs, Balloons, Streamers, or Other Wind-Activated Devices Other than Flags and Banners
1. Must not be displayed for more than four 10-day periods per calendar year.
2. No more than one sign of these types may be displayed per 100 feet of street
frontage.
C. Other Temporary Signs The following applies to temporary signs other than banners, feather signs, balloons,
streamers, or other wind-activated devices.
1. Two signs are permitted per lot, except that corner lots may have two signs on each
adjacent street.
2. Signs may not exceed 64 square feet in area.
3. Signs may not exceed 5 feet in height, or 10 feet in height for construction signs.
4. The signs may be attached to the exterior wall of a building, no higher than the top of the parapet or roof.
5. Signs may not be illuminated.
6. Signs must be rigid and may not be made of fabric or similar materials.
7. Sign faces must be constructed of materials that present a finished appearance. Rough-cut plywood and plastic are not allowed.
8. Any sign frames must be made of painted or stained wood, anodized aluminum, or
metal. Plastic frames are not allowed.
9. Signs must be maintained in good condition.
10. Construction signs may be erected no more than 15 days before the beginning of construction for which a valid permit has been issued and must be removed within
30 days following the opening of the development or business.
11. Temporary signs other than construction signs may be displayed for no more than
60 consecutive days. Additional posting time may be allowed by the Planning Director if the temporary activity on the site is continuing.
Leer este código donde se publica (city website (Revize)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.