Ir al contenido
Georgia Commons
Menú

Bremen · Ordenanza de zonificación

Part III - LAND DEVELOPMENT CODE / Chapter 120 - SUBDIVISION AND PLATTING REGULATIONS / Article II - PLATTING PROCEDURE

Sec. 120-28. Bonds.

Sobre este texto

  • As published by Municode, current through 2025-10-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Performance bonds.

(1) A performance bond, irrevocable letter of credit, or a certified cashier check shall be forwarded to the city, directly from the bonding agent or bank, prior to the start of construction, if the developer does not, intend to complete all roadway and infrastructure improvements prior to obtaining any building permits. Should, the developer find it necessary once infrastructure and road construction has begun to start building, then at that time, any of the above financial vehicles shall be accepted to cover 100 percent of the remaining portions of roadway and infrastructure improvements, before any building permit will be issued. The performance bond shall be issued to the city, by the developer's financial representative at a cost of 100 percent of the estimated cost of infrastructure, and buffer zone improvements, as calculated by the city engineer. If, substantial progress has not been made toward completion of the project, during the first nine months after the construction plans have been approved, a written notice will be sent to the developer expressing the city's concern and 30 days shall be given for the developer to appropriately address the city's concern. The bond shall be executed, only if the staff, the city attorney and council determines that the project or subdivision will be abandoned before completion. The bond is only to ensure the completion of the proposed infrastructure and buffer zone improvements for the given subdivision or project and to eliminate the possibility of current or future taxpayers paying for the uncompleted improvements.

(2) If the subdivider develops a sufficiently large tract of land in phases a performance bond or other adequate financial vehicle shall be issued for each respective phase following the above format. Building permits shall only be issued for phases containing completed infrastructure improvements unless the above financial vehicles are in place.

(b) Maintenance bond.

(1) A subdivider must have completed 100 percent of the infrastructure and road improvements, and maintenance the subdivision for a period of not less than two years, following the filing of the plat of record. A maintenance bond shall be issued to the city at the time the final plat is filed, pending the city engineer's approval of all infrastructure improvements. The maintenance bond shall be based on 50 percent of the estimated cost of construction as calculated by the city engineer, through current cost estimates based on a regional or state wide basis. The bond shall be issued to the city for repairs and corrective actions neglected by the subdivider.

(2) The maintenance bond shall remain in effect for two years; six months prior to the termination of the maintenance bond the city engineer shall perform a re-inspection of the infrastructure improvements to determine if any corrective action is deemed necessary. Should the city engineer's inspection reveal deficiencies, the owner shall be given a written notice within two weeks of the city engineer's inspection. The owner shall then be given two additional weeks to meet with the city engineer to review the findings of said inspection. The owner shall then be given three months to correct any deficiencies, prior to the forfeiture of the maintenance bond to the city. The dedication of the infrastructure to the city shall be contingent upon acceptance by the mayor and council, provided all corrective action have been satisfactorily performed and any fees paid. The termination of said maintenance bond shall immediately be requested by staff at the next regularly scheduled council meeting following the two-year expiration period.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Code 1996, § 82-83; Ord. of 3-8-1999, pt. II, art. 7)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bremen/zoning/120-28@2025-10-13-d74ecd16ce

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bremen Zoning Ordinance, Sec. 120-28. Bonds | Georgia Commons