Sec. 23-18-6. Review of major institutional use developments.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Any proposed new or expanded permitted institutional use that is considered of major significance by the department of planning and code enforcement or is proposed to have a principal building or group of buildings with more than 100,000 square feet of floor area, must be reviewed by the planning and appeals commission and approved by the city commission. This includes existing permitted uses that are proposing expansion of facilities which results in the facilities having 100,000 square feet or more floor area.
The criteria for such a review shall include the following:
(1) A master plan for the development shall be submitted for review by the planning and appeals commission and recommendation for approval or denial by the city commission. Such plan shall include, at a minimum, the following:
a. A site plan for the initial and any future contemplated development on the site controlled by the owner/developer.
b. Building elevations sufficient to determine the appearance and design features of each proposed building including a description of the building materials and any special external features of the building.
c. Ingress, egress, parking, loading, pedestrian access and other similar features.
d. A signage plan including principal and secondary use identification, access and directional signs.
e. A complete landscape plan.
f. Any additional details regarding the development proposal deemed necessary by the planning director.
(2) Traffic. The proposed development shall be reviewed by the city traffic engineer and determined to not to adversely impact the capacity of adjacent or connecting streets serving the site. Access points for vehicular and/or truck service shall likewise be reviewed and approved.
(3) Utilities. A review of water, sanitary sewer and stormwater serving and/or discharged from the site shall be made by the city engineer and joint water and sewer commission and shall be determined to have no adverse effect on the utilities serving the site or obtain assurances and financial commitments from the developer that the proposed development shall make necessary improvements to those utilities to remove any service deficiencies. The city commission may determine that the public interest would be best served by the city making such improvements to utilities and streets required by the proposed development.
Following review by the department of planning and code enforcement and planning and appeals commission, to be completed within 60 days following submission of a complete master plan, a report will be prepared and submitted to the city commission within 30 days.
The city commission will include the report and recommendation on the agenda at its next city commission meeting provided it has at least a two-week period in which to review the proposal.
Historia
(Ord. No. 1081, 9-20-2023)