Buford · Código de ordenanzas
Appendix A - FRANCHISES
9.10.14. Final Inspection; As-Built Drawings; Delivery of Inspection and
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Maintenance Agreement.
Upon completion of the development, the applicant is responsible for:
(a) Certifying that the stormwater management system is functioning properly and was constructed in conformance with the
approved stormwater management plan and associated hydrologic analysis;
(b) Submitting as-built drawings showing the final design specifications for all
components of the stormwater management system as certified by a professional engineer;
(c) Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan; and
(d) Delivering to City of Buford a signed inspection and maintenance agreement
that has been recorded by the owner in the property record for all parcel(s) that make up the site.
The required certification under part (a) [of this section] shall include a certification of volume, or other performance test applicable to the type of stormwater management system component, to ensure each component is functioning as designed and built according to the design specifications in the approved stormwater management plan.
This certification and the required performance tests shall be performed by a qualified person and submitted to the City of Buford with the request for a final inspection. The City of Buford shall perform a final inspection with applicant to confirm applicant has fulfilled these responsibilities.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.