Bulloch County · Ordenanza de zonificación
Appendix 19 - 2. WATER/SEWER AGREEMENT �B� FOR TAX ALLOCATION DISTRICT #1 GEORGIA, BULLOCH COUNTY / Article 26 - STANDARDS FOR TOWERS AND WIRELESS TELECOMMUNICATIONS FACILITIES
Section 2606. Application procedures.
Sobre este texto
- As published by Municode, current through 2026-02-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Building permits. It shall be unlawful for any person or entity who has not made application for and obtained a building permit in accordance with this article to:
(1) Erect, construct in place, re-erect, or replace, any tower;
(2) Locate or co-locate any telecommunications facilities on or around a pre-existing tower for which a permit has not been obtained in accordance with this article;
(3) Locate any telecommunications facilities on an alternative tower structure; or
(4) Modify any existing tower (or any alternative tower structure that currently serves the function of a tower) by increasing the height thereof.
Applications for building permits and informational submittals under this article shall be submitted to the zoning administrator or his designee and shall be accompanied by the appropriate fee as set forth in the schedule of fees and charges on file in the office of the clerk of the board of commissioners.
(b) Submittals. A complete application shall contain the following:
(1) A site plan or plans to scale specifying the proposed location and dimensions of the tower; if lighting is required, the proposed lighting system and alternative lighting systems that would meet FAA approval; size of accessory buildings or uses; access;
parking; fences; landscaping plans; existing and adjacent land uses; proposed distance of the tower from existing structures, buildings, overhead utility lines, public rightsof-way, and adjacent property lines; and utilities inventory indicating the locations of all drainage, power lines and any other items as impacting the proposed tower site.
The site plan shall show all public views and all features which screen public views and adjacent property views from the proposed tower.
(2) Visual simulations of the proposed tower or alternative tower structure illustrating the potential visual impact. The applicant shall submit visual simulations of the proposed tower or alternative tower structure that are to scale and that include all initial and future co-location antennas (including proposed coaxial cable runs for each proposed antenna). The visual simulations can consist of photo simulations or other means which accurately depict the proposed structure as it would be seen from adjacent properties and the public view, including but not necessarily limited to the nearest public roadway and the public roadway from where the structure would be most visible, if that point is not the nearest public roadway. Such visual simulations shall be accomplished by utilizing a balloon test and/or GPS coordinates in order to accurately depict the visual impact of the tower or alternative tower structure from these various locations. The applicant shall seek to obtain the consent of all adjacent property owners for purposes of going onto their property in order to accurately create the visual simulations. If such consent is granted, the applicant shall create visual simulations from the location where the proposed tower would be most visible from each habitable existing structure on the adjacent property, and up to two additional locations if specifically requested by the property owner and, if no such locations are requested, from the location from which the proposed tower or alternative tower structure would be most clearly visible. The applicant shall exercise due diligence and good faith in attempting to obtain the consent of adjacent property owners and must provide a detailed explanation of its efforts to do so if such consent is denied.
(3) A report from a licensed professional engineer, documenting the following:
(A) Tower height and design, including structural and technical engineering, and other pertinent factors governing the proposed tower design. A cross-section of the tower structure shall be included.
(B) Total anticipated structural capacity of the tower, including number and types of antennas which can be accommodated.
(C) Evidence of structural integrity of the tower.
(D) Failure characteristics of the tower and demonstration that the site, setbacks and separation from other uses are of adequate size or distance.
(E) If the application is for an antenna or antennas and related equipment or appurtenances to be located or co-located on a pre-existing tower or located on an alternative tower structure, the engineer's report shall document that the pre-existing tower or alternative tower structure has the structural capacity to support the additional antenna or antennas and related equipment or appurtenances and that the additional antenna or antennas and related equipment or appurtenances will not overstress the pre-existing tower or alternative tower structure.
( 4) Certification from a qualified radio frequency engineer that the tower and/or antenna(s) and related equipment or appurtenances:
(A) Comply with all current regulations of the FCC, with specific reference to FCC regulations and guidelines governing nonionizing electromagnetic radiation
(NIER).
(B) Are not expected to result in harmful interference to any existing or previously proposed Public Safety Telecommunications service.
(5) Written documentation from the FAA that the FAA has determined that the tower and/or antenna(s) and related equipment or appurtenances is not identified as an obstruction and would not be a hazard to air navigation.
(6) Identification of the geographic service area to be served by the subject installation, including accurately scaled color radio frequency (RF) plotted maps showing coverage from all sites providing service within the county from the applicant's existing network and including the proposed site. Where the proposed site does not result in continuous coverage within the county, when coupled with other existing sites providing service, the maps shall also depict the nearest associated telecommunications facility site(s) within the network. RF maps shall also be provided which depict the proposed coverage, comparing coverage of the proposed facility with coverage from all potential co-location sites within a one-mile radius of the proposed site and containing sufficient engineering data to show that said sites would not be feasible to fill significant, required service gaps.
(7) If the application is for a new tower or towers, the applicant must identify all existing towers, all alternative tower structures, and all towers for which applications are currently pending which are located within the applicant's search area. This shall include, as it relates to the applicant's proposed site, a description of the distance and location of all such towers and alternative tower structures, both within and outside the applicant's network. The applicant must provide specific, detailed evidence with regard to each identified tower or alternative tower structure that it cannot accommodate the applicant's proposed antenna(s) and related equipment or appurtenances and that co-location is therefore not possible. Such evidence may consist of the following:
(A) No existing towers or alternative tower structures are located within the geographic area required to meet applicant's engineering requirements.
(B) Existing towers or alternative tower structures are not of sufficient height to meet applicant's engineering requirements.
(C) Existing towers or alternative tower structures do not have sufficient structural capacity to support applicant's proposed antenna(s) and related equipment or appurtenances.
(D) The applicant's proposed antenna(s) would cause harmful electrical interference with the antenna(s) on or near the existing towers or alternative tower structures, or the antenna(s) on or near the existing towers or alternative tower structures would cause harmful electrical interference with the applicant's proposed antenna(s).
(E) The addition of the applicant's proposed antennas would cause the existing tower to exceed FCC guidelines for RF exposure at or beyond the site fence.
(F) The fees, costs, or contractual provisions required by the owner in order to utilize an existing tower or alternative tower structure or to adapt an existing tower or alternative tower structure for utilization are unreasonable. Costs exceeding new tower development are presumed to be unreasonable.
(G) The applicant demonstrates that there are other limiting factors that render existing towers and alternative tower structures infeasible.
(8) If the application is for a new tower, the applicant must submit a letter of intent committing the tower owner and his or her successors to allow the shared use of the tower if an additional user agrees in writing to meet reasonable terms and conditions for shared use.
(9) The applicant shall submit a site inventory and future facilities plan to include the following:
(A) An inventory of all of the applicant's existing and proposed telecommunications facility sites within the county and within one mile of the border thereof, including specific information about the location, height, and design of each tower, and the current users and remaining capacity of each existing tower.
(B) Where the RF coverage maps required by section 2606(b)(6) depict areas within the county which, with the addition of the proposed telecommunications facility remain unserved, the applicant shall include an affirmative statement that it does not intend to serve such areas or shall set forth the timeframe in which such additional area is intended to be served and the number and approximate location of proposed telecommunications site(s) that will be needed to provide service to the unserved area(s).
(C) Where an applicant proposes to add a telecommunications site in an area that, in a prior submission to the county had been shown as receiving service, the applicant shall fully explain why the previously depicted coverage was not obtained or proved inadequate. The applicant shall also include an affirmative statement as to what steps have been taken to ensure that the RF maps submitted with the instant proposal are of higher accuracy and shall explain, in detail, what steps have been taken to increase the accuracy of the current coverage map over the previously submitted map.
(c) Informational submittals. Any person or entity co-locating an antenna or antennas and related equipment or appurtenances or replacing existing antenna(s) on or around a tower for which a permit has already been issued shall submit the following for information only:
(1) The name of the person or entity co-locating on the tower.
(2) The name of the owner of the tower.
(3) The tower's permit number.
(4) The location of the tower.
(5) Certification from a licensed professional engineer that the tower has sufficient structural capacity to accommodate the proposed additional loading without becoming over stressed.
(6) Certification that the antenna(s) and related equipment or appurtenances comply with all current regulations of the FCC, with specific reference to FCC regulations and guidelines governing non-ionizing electromagnetic radiation (NIER).
(d) Independent expert review. In addition to any permit fees for a new tower or increase in height to an existing tower, the applicant shall be required to pay to Bulloch County an independent expert review fee as set forth in the schedule of fees and charges per application at the time the application is filed. If the actual cost to Bulloch County for independent expert review of the application is greater than this initial fee, the applicant shall be billed for the difference and payment shall be made prior to the hearing before the board of commissioners.
(e) Forms. The zoning administrator is authorized to develop application forms to assist in providing the required information and facilitate the application process.