Sec. 40-3. Connection fees.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Water and sewer connection fees shall be set by the mayor and city council by resolution or simple vote and a copy of the connection fees kept on file in the office of the city clerk. A connection fee study shall also be maintained in the office of the city clerk that demonstrates the rough proportionality and rational nexus of the connection cost and the approved fee schedule. The connection fee may include, but is not limited to, the following components as follow:
(1) Tap fee—The cost of tapping into the water main and providing a service main and meter box which will include a meter and data transmitter; and
(2) System development charge (SDC)—The fair share cost of water system infrastructure including pipe size, elevated storage, water supply/treatment and pumping to provide peak day water capacity based on requested water capacity or by meter size, and the fair share cost of wastewater system infrastructure including pipe size, lift stations and treatment to provide peak day sewer capacity based on requested flow capacity or water meter size.
(b) Residential. Residential water, and sewer connection fees, shall be charged, per connection, based on a rate schedule maintained and available at city hall. A three-fourthsinch meter will normally be provided for residential water service. Connection fees for larger services will be in accordance with the fees listed on the schedule located at city hall.
(c) Commercial. Commercial water and sewer connection fees shall be charged, per connection based on a rate schedule maintained and available at city hall.
(1) The city reserves the right to negotiate higher or lower connection fees based on special circumstances determined by the city for commercial and industrial customers, multi-unit dwellings (such as apartments), and for residential subdivision connections.
(2) All connections are subject to approval of the Georgia Department of Natural Resources rules and requirements.
(3) Notwithstanding any other provision to the contrary in this article, a commercial development or an apartment complex may utilize a master water meter to be billed by the city for the entire development or complex, provided the development or complex has more than four units. A holder of a master water meter may meter or require its tenants to meter individual usage and reimburse the holder of the master meter for the water and sewer usage; provided, however, said reimbursement shall not exceed the cost of the water or sewer paid to the city by the master meter holder.
For all commercial developments or apartment complexes served by a master meter, water and sewer tap fees shall be based on the size of the master meter. All development must meet the requirements outlined in the 2010 Georgia Water Stewardship Act.
(d) Mixed use/special developments. Each use in a development that has a mixture of attached and detached units and/or residential and nonresidential uses and/or use of master meter shall identify the number of units by type and apply the appropriate fees based on the connection fee schedule.
(e) In the event that the developer disagrees with the capacity/fees provided in the connection fee schedule, the typical peak day gallons needed by the development shall be provided by the developer calculated by a professional engineer or architect registered in the State of Georgia.
(1) The capacity needs calculation and methodology shall be approved by City of Byron engineering staff or consultant for reasonableness.
(2) Developers may appeal any rejected calculation and methodology to the mayor and city council who, in the manner of voting provided in the Byron City Charter, shall render a decision on any appeal after review and consultation with the city administrator or his/her designee(s). The mayor and city council may receive testimony under oath, along with other evidence, from members of the public works department, its designees, any qualified and licensed engineer who is trained in the field of water and sewer utilities, or any other party(ies) or witnesses who may have testimony or evidence relevant to the issues on appeal.
Any appeals shall be taken within 30 days of the decision regarding the appealable matters in this section by filing with the city clerk and city administrator a notice of appeal in writing specifying the grounds thereof. Upon the filing of the notice of appeal, the city clerk shall forward same to the city administrator who shall review the facts and circumstances and forthwith transmit to the mayor and city council all documentation constituting the record upon which the decision appealed from was taken.
The mayor and city council shall fix a reasonable time for hearing the appeal and give written notice to the appellant at least ten days prior to the hearing date. The notice shall indicate the place, date, and time of the hearing. The mayor and city council shall affirm, reverse, affirm in part, or reverse in part the decision relating to this section after hearing the evidence. If the decision relating to this section is reversed in whole or in part, resulting in a refund or credit due to the property owner, then such refund or credit shall be calculated retroactive to the date of the initial appeal.
The decision of the mayor and city council shall be final, and there shall be no further administrative action. Any person or entity aggrieved or dissatisfied with the decision of the mayor and city council may seek review of that decision to the Superior Court of Peach County by the means of a petition for review as provided by O.C.G.A. § 5-3-1 et seq., as amended from time to time.
Historia
(Ord. of 6-8-1978, § 3; Ord. of 3-11-1982; Ord. of 5-7-1985(1); Ord. of 10-3-1988; Ord. of 11-3-1997; Ord. of 2-4-1999; Code 1987, § 11-2; Ord. No. 2003-2, 4-14-2003; Ord. of 2004-1, § 11-2, 6-14-2004; Ord. No. 2006-1, 3-13-2006; Ord. No. 2006-2, 3-13-2006; Ord. No. 2010-3, 3-8-2010; Ord. No. 2018-1, 5-14-2018; Ord. No. 2022-6, 2-14-2022; Ord. No. 2024-11, 1-13-2025)
Reuniones que se refieren a esta sección
- Byron City Council, 13 de enero de 2025 (Actas)Se refiere a esta sección en las actas: “SECTION 40-3”, “SECTION 40-3”Nombra una ordenanza de la historia de esta sección en las actas: “Ordinance #2024-11”
- Byron City Council, 11 de noviembre de 2024 (Actas)Se refiere a esta sección en las actas: “SECTION 40-3”, “SECTION 40- 3”
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.