Cairo · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 22 - ZONING / Article I - IN GENERAL
Sec. 22-26. Stormwater control.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The director of public works (hereafter referred to as the director) shall review andapprove a stormwater drainage plan for all classes of construction and propertydevelopment prior to the issuance of any permits by the building inspector. The plan must include the following as a minimum:
(1) Provisions for stormwater retention, if required by the terms of this chapter.
(2) Plans for the controlled release of retained stormwater into the Cairo stormwater drainage system. (The rate of release cannot exceed predevelopment flow rates from the property being developed).
(3) A topographicmap of the property or sufficient spot elevations on the plan at critical points to confirm direction of stormwater flow before andafter development.
Finished floor elevations must be shown.
(4) The approximate limits of any flood zone encroaching onto the property or a written statement that no part of the propertyis in a flood zone.
(5)Sizes of all existing and proposed stormwater facilities on or near the property which will be used to drain the property.Calculations to support the sizing of all drainage structures shall be submitted simultaneously with the drainage plan.
(6) If the property to be developedis contiguous to a state route or proposes to use a state department of transportation (DOT) drainage system for stormwater disposal, written evidence of coordination with DOT and copies of all DOT permits must be provided with the stormwater plan.
The above described stormwater plan shall be developed by and bear the stamp of a registered land surveyor or professional engineer, licensed to practice in the State of Georgia.
The above notwithstanding, a stormwater plan shall not be required on:
(a) A single-family residential lot of one (1) acre or less unless that lot is contiguous to a larger tract, which in the opinion of the director islikely to be developedin the near future. In thislatter case, the director, at its [his/her] discretion, may require adrainage plan for the entire tract.
(b) New construction, where the total area to be pavedand/or to be covered by roof is less thansix thousand (6,000) square feet. If, however, the propertyabuts a state right-of-way, written evidence of coordination with DOT will be required.
The developer must bear all costs associated with management of stormwater on the property to be developed.
Historia
(Ord. No. 548, § 3.20, 1-8-01)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.