Cairo · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 22 - ZONING / Article VII - ADMINISTRATION, ENFORCEMENT, VIOLATION AND PENALTY
Sec. 22-422. Permits.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The following shall apply in the issuance of any permits:
(a) Permits required. It shall be unlawful for any person to commence excavation for, or construction of any building structure, or moving of any existing building without first obtaining a building permit from the building
official. No permit shall be issued for the construction, alteration or remodeling of any building or structure until an application has been submitted in accordance with the provisions of this chapter, showing that the construction proposed is in compliance with the provisions of this chapter and with the building codes.
No plumbing, electrical, drainage or other permit shall be issued until the building inspector has determined that the plans and designated use indicate that the
structure and premises, if constructed as planned and proposed, will conform to the provisions of this chapter.
Historia
(Ord. No. 548, § 24.02, 1-8-01)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.