Ir al contenido
Georgia Commons
Menú

Calhoun · Ordenanza de zonificación

Appendix A - ZONING / Article X - A. TOWERS AND ANTENNAS

Section 10-A.7. Additional application requirements.

Sobre este texto

  • As published by Municode, current through 2026-08-24
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

In addition to the application submitted pursuant to section 10-A.4 of this ordinance, the application to amend the zoning map of Calhoun,

Georgia, for zoning consideration shall have attached thereto the following:

1. Inventory of existing towers. An inventory of the applicant's existing towers which are within the City of Calhoun and

Gordon County, Georgia, including all municipal corporations located therein and including areas within one-half mile of the border thereof, including the specific locations, heights, and designs of each such tower.

2. A description of the proposed tower's area of service.

3. Photo simulations or rendering of the proposed tower illustrating the potential visual impact. For towers exempt from further review, this section shall be satisfied by photos or drawings of similar towers.

4. A site plan or plans to scale specifying the proposed location and dimensions of tower(s), size of maintenance/operation buildings or uses, access, parking, fences, landscape plans, existing and adjacent land uses.

5. A site plan for alternative tower structures shall show adjacent rights-of-way, buildings, and structures, including the structure's height and dimensions,

proposed antenna location on the structure or building and adjacent land uses.

6. A report from a professional engineer, currently licensed in Georgia, documenting the following:

a. Tower heights and design, including technical engineering, economic and other pertinent factors governing the proposed tower design.

b. Total anticipated capacity of the structure, including number and types of antennas which can be accommodated.

c. Evidence of structural integrity of the tower structure.

d. Failure characteristics of the tower and demonstration that the site, setbacks, and separation from other uses are of adequate size or distance to protect the safety of the general public and all of nearby landowners.

7. A written statement from the owner of the tower certifying that the proposed tower site complies with regulations administered by the FAA and FCC, or stating that the tower is exempted from these regulations.

8. Evidence of compliance with collocation requirements set forth in section 10.A.6.

9. Any additional information which may be reasonably requested by the building inspector, the zoning advisory board or the mayor and council, in order to evaluate fully and to review the proposed tower site and the potential impact of a

proposed tower and/or antenna.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:calhoun/zoning/10-a.7@2026-08-24-b7ab542475

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Calhoun Zoning Ordinance, Section 10-A.7. Additional application requirements | Georgia Commons