Canton · Ordenanza de zonificación
Part III - DEVELOPMENT CODE / Chapter 103 - SITE PLANNING AND PROJECT DESIGN STANDARDS TABLE OF CONTENTS
103.04.07. Access to parking lots.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. A plan of ingress and egress and stormwater drainage shall be submitted to the director and shall be approved prior to the issuance of a land disturbance permit for off-street parking lots, whether public or private.
B. Installation of entrances, exits, and drainage systems shall have been completed prior to the issuance of a certificate of occupancy.
C. All curb cut locations as well as widths shall comply with this UDC.
Historia
(Ord. No. 2014-18, § 2, 8-21-2014)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.