Part III - DEVELOPMENT CODE / Chapter 103 - SITE PLANNING AND PROJECT DESIGN STANDARDS TABLE OF CONTENTS

103.06.02. Applicability.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. The terms and provisions of this section shall apply to all activity which requires the issuance of a land disturbance permit (LDP) or a building permit on any real property within the city.

B. No clearing, grubbing, grading, or other removal of existing vegetation that may affect the health of existing tree coverage may occur until it is determined that the proposed development is in conformance with the provisions of this UDC.

C. A tree removal permit shall be required in accordance with the following standards:

1) No disturbance shall occur within the protective zone of specimen trees or stands of trees without an approved tree removal permit.

2) A tree removal permit is required to remove any tree larger than five inches in diameter from any property.

3) For all building permit submittals, there shall be a fee for obtaining a tree removal permit as indicated in section 103.06.08 (Removal of trees) of this UDC. The fee will be established by city council.

4) If any tree, five-inch DBH or greater, is removed from any property without a tree removal permit, the property owner shall pay a fine of three times the tree removal fee calculated.

D. The requirements of section 103.03.00 (Landscape and buffer standards) shall apply in conjunction with this section.

E. Table 103-8, summary of applicability and exemptions summarizes those activities which are exempt from the provisions of this section and those for which a tree protection plan/landscape plan must be approved prior to the issuance of an LDP and/or building permit.

Table 103-8 Summary of Applicability and Exemptions Project Type Type of Construction Applicability One- and two-family dwellings, commercial/office sites with less than one acre land disturbance Building permit. Required Grandfathered projects Any property included within the limits of an LDP-approved prior to the effective date of this UDC, and remaining portion of a project where 75 percent of area has already been included in LDP's approval prior to October 1, 2004, which was the effective date of the ordinance on tree protection and landscaping.

Exempt Horticultural or agricultural operations Land clearing for clearly agricultural purposes, including legitimate timber harvesting; plant or tree nurseries; orchards. This exemption shall not be interpreted to include tree harvesting

incidental to the development of land, or tree harvesting on land that is anticipated to be developed for nonhorticultural uses.

Exempt Diseased or infested trees* Removal upon advice and written finding of the county extension service, Georgia Forestry Commission, a certified arborist, and urban forester, or the community development director.

Exempt Residential and nonresidential subdivisions Land disturbance limited to areas needed for streets, drainage, and utilities.

Required Land disturbance beyond areas needed for streets, drainage, and utilities.

Building permits for construction of one and two dwellings.

Recreation areas, common areas, and entrances.

Multiple-family and nonresidential sites Clearing or clearing and grubbing, limited to areas outside of all minimum yards, buffers, and 100-year floodplain.

Required Clearing or clearing and grubbing only, proposing disturbance within a minimum yard or 100-year floodplain.

Grading or land disturbance permit.

Building permit.

* Permit required to remove tree; however no fee is required.

F. In addition to the requirements of table 103-8, all legitimate timber harvesting shall be required to provide and maintain a 50-foot undisturbed buffer along the entire perimeter of the property, including road frontages, during the land disturbance activity, except for the authorized access crossings. Once tree harvesting takes place in conformity with the above regulations, no development of the property shall be permitted for a period of three years that would require the cutting of trees preserved. No timber harvesting shall be undertaken on any nonresidential parcel of land unless the transitional buffer zones required by section 103.03.00 are preserved in a natural and undisturbed state.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2014-18, § 2, 8-21-2014)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:canton/zoning/103.06.02@2026-11-11-9ef2a6f64d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Canton Zoning Ordinance, 103.06.02. Applicability | Georgia Commons