Canton · Ordenanza de zonificación
Part III - DEVELOPMENT CODE / Chapter 103 - SITE PLANNING AND PROJECT DESIGN STANDARDS TABLE OF CONTENTS
103.07.08. Administrative review.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. The following project items do not need design review approval from the design review team. Review and approval of the proposed project is handled by the community development department.
1) Accessory structures, i.e.
a. Dumpster enclosures
b. Garages
c. Mail kiosks
2) Additions, less than 25 percents of the principal building
3) Awnings/canopies
4) Doors
5) Fences
6) Louvres/shutters
7) Painting, earth or neutral hue tones
a. Accent colors, limited to 20 percent of the façade
8) Railings/ramps
9) Solar panels/arrays
10) Utilities, properly screened
11) Windows
B. Continuation of existing development that received approval from the Canton Design Review team prior.
1) Townhomes
C. Zoning conditions of approval prior to August 1, 2025 that require design review approval can be reviewed administratively.
Historia
(Ord. No. 2025-0904-2, 9-4-2025)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.