Ir al contenido
Georgia Commons
Menú

Canton · Ordenanza de zonificación

Part III - DEVELOPMENT CODE / Chapter 111 - DESIGN STANDARDS: SEWER SYSTEM TABLE OF CONTENTS

111.03.06. Pump control panel.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. For lift stations less than 100 HP, controls and electrical components shall be housed incompletely weather proof stainless steel metal cabinets (NEMA 4X stainless steel). The cabinets shall be provided with condensate heaters, spare fuses and spare bulbs of each type that is used in the electrical/control system. Soft start starters shall be acceptable in NEMA 3R ventilated or air-cooled panels.

B. For lift stations that are 100 HP or larger, an electrical building shall be provided to house the electrical distribution equipment. NEMA 1A enclosures shall be used in buildings. The buildings must be provided with a heat pump for climate control within the building.

C. The pump motor starters shall be provided by the pump manufacturer. Starters for motors less than 20 horsepower shall be full voltage, non-reversing, NEMA rated. Starters for 20 horsepower and larger motors shall be Square D Altistart, Allen Bradley, Solid State Reduced Voltage or alternate acceptable to the city.

D. The developer shall furnish a pump controller with all necessary controls including, but not limited to, the following:

1) Provide starters for each pump.

2) HOA switches.

3) Pilot lights.

4) Power indicator lights.

5) Other lights as required.

6) Alarm silence push button.

7) Alarm reset button.

8) Elapsed time indicators.

9) Control transformers — 480-volt to 120-volt step downs shall not be mounted inside the control panel for heat control purposes.

10) Strip heater and thermostat.

11) Alarm horn and wiring — 120-volt.

12) NEMA 4x red alarm light and wiring — 120-volt.

13) Phase under voltage monitor with time delay.

14) Moisture sensing seal failure relays with indicator.

15) Provide alarm outputs for high water alarms and pump trouble for each pump. Coordinate with SCADA unit manufacturer for types of outputs required. Note: the pump trouble outputs are to have no time delay added.

16) Provide relays for phase failure and phase unbalance protection.

17) Provide lag pump on delay timer relay, zero to 60 seconds for each pump, such that the pumps cannot start at the same time.

18) Provide pump failure alarm output for each motor to include motor overload, motor thermal cutout and leak seal failure conditions.

19) Only the high level and low level alarms are to be wired to the alarm horn and red light. No pump failures shall be wired to the horn and light circuit.

20) Breakers for security lighting, generator block heater, and battery charger. Add two spare 120-volt breakers.

21) Provide terminal blocks for all connections into and out of the panel.

E. Phase converters will not be used on lift station electrical power supply. Lift station power shall be 240 VAC/3 phase or 480 VAC/3 phase and control circuits shall be 120 VAC/1 phase.

F. All 480 volt circuit breakers in the pump control panel shall be rated a minimum of 14 KAIC and all 240 volt and 120 volt circuit breakers shall be rated a minimum of 10 KAIC.

G. All wiring shall be done in rigid galvanized steel conduit. Conduit installed below grade shall be painted with two coats of asphaltum paint. Schedule 40 PVC conduit may be used for conduit runs underground. All PVC conduit shall be installed in concrete duct banks per NEC. Concrete ducts shall be poured monolithically with steel reinforcement as necessary.

H. A main circuit breaker shall be installed to disconnect power to the entire station.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2014-18, § 2, 8-21-2014)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:canton/zoning/111.03.06@2026-11-11-d5e4468207

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Canton Zoning Ordinance, 111.03.06. Pump control panel | Georgia Commons