Carrollton · Ordenanza de zonificación
Appendix B - ZONING (RESERVED) / Article 10 - ADMINISTRATIVE PROCEDURES
10.00.02. Approvals Required
Sobre este texto
- As published by Municode, current through 2025-11-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
G. A change of use occurs when an existing use of land or a building is replaced by another use. When a change of use occurs, an application for a development plan is required.
H. Certificate of Occupancy. A Certificate of Occupancy authorized and issued by the City Manager shall be required in advance of:
1. The initial use or occupancy of a lot.
2. Any change in the use or occupancy of a lot.
3. The initial use and occupancy of a building erected after enactment of this ordinance.
4. Any change in the use of a building existing at the time of enactment of this ordinance.
5. The change in use, extension, alteration, or reconstruction of any non-conforming use existing at the time of the enactment of this ordinance or an amendment thereto. The Certificate of Occupancy shall specifically state how the non-conforming use fails to meet the provisions of this ordinance.
I. Except in the case of non-conforming uses existing at the time of the enactment of this UDO or an amendment thereto, no Certificate of Occupancy shall be issued unless the lot, building or structure complies with the provisions of this UDO.
J. A record of all Certificates of Occupancy shall be kept on file with the City of Carrollton and a copy shall be furnished on request, to any person having a proprietary or tenancy interest in the lot, building or structure involved.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.