Ir al contenido
Georgia Commons
Menú

Carrollton · Ordenanza de zonificación

Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT

7.08.00. STORMWATER MANAGEMENT PLAN REQUIREMENTS

Sobre este texto

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this article, including the performance criteria set forth in Section 7.13.00 of this article.

B. The stormwater management plan shall be in accordance with the criteria established in this section and must be submitted with the stamp and signature of a design professional, licensed in the State of Georgia, who is qualified to address stormwater issues and who must verify that the design of all stormwater management facilities and practices meet the requirements of the Georgia Stormwater Management Manual and the City's Design and Construction Standards.

C. The stormwater management plan must ensure compliance with the requirements and criteria in this article and minimize adverse post-development stormwater runoff impacts from the development. The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system.

The plan shall include all of the information required by the Georgia Stormwater Management Manual and the City's Design and Construction Standards. This includes:

1. Common address and legal description of site.

2. Vicinity map.

3. Existing conditions hydrologic analysis. The existing conditions hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of existing site conditions with the drainage basin boundaries indicated; acreage, soil types, and land cover of areas for each sub-basin affected by the project; all perennial and intermittent streams and other surface water features; all existing stormwater conveyances and structural control facilities; direction of flow and exits from the site; analysis of runoff provided by off-site areas upstream of the project site;

and methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. For redevelopment sites, predevelopment conditions shall be modeled using the established guidelines for the portion of the site undergoing land development activities.

4. Post-development hydrologic analysis. The post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of developed site conditions with the post-development drainage basin boundaries indicated; total area of post-development impervious surfaces and other land cover areas for each sub-basin affected by the project; calculations for determining the runoff volumes that need to be addressed for each sub-basin for the development project to meet the post-development stormwater management performance criteria in Section 7.13.00 of this article; location and boundaries of proposed natural feature protection and conservation areas; documentation and calculations for any applicable site design credits that are being utilized; methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. If the land development activity on a redevelopment site constitutes more than 50 percent of the site area for the entire site, then the performance criteria in Section 7.13.00 of this article must be met for the stormwater runoff from the entire site.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:carrollton/zoning/7.08.00@2025-11-03-85712c2710

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Carrollton Zoning Ordinance, 7.08.00. STORMWATER MANAGEMENT PLAN REQUIREMENTS | Georgia Commons